background image

PE

0

2

6

4

  I >

1

5

3

QF

3

U1

V1

W1

U

2

6

4

1

5

3

V

W

KM1

YV2

KA3

R

S

T

KM1

KA1

18

TC1
380V/24V
220V/24V

SB0-1

12

11

KA3

SQ1

KA4

KA4

KA3

20

23

25

SB0

10

KA2

SQ6

HL1

HL0

Limit SQ1:  12   25

Safety SQ :  16   21

Leveling SQ6:  12   23

Limit SQ to normally open

SB1

SB2

KA1

KA2

KA4

KT

KA1

KT

YV1

21

KM1

SQ2-5

KA2

KA4

KM1

Safety valve:  0   27

Lower oil valve:  0   21

Warning lights:  0   20

13

14

15

17

27

16

22

24

26

12

Model:

Lifting Capacity: 3500kg

Cover Area: 6000*3400mm

Date:

Country:

Project:

Drawing:

Pump motor:  4Kw

Lifting Speed:  4mts/min

Drive: Hydraulic

Power Supply:

Projection Mode:

Ratio: 1:1

GENERAL LAYOUT

N.M.

N.A.

05-08-2021

FP-VRC

Total Travel: 4900mm

Ramp: H200mm

Platform size: 5950*3350mm

Summary of Contents for AutoLift FP-VRC

Page 1: ...OR DEATH Specifications subject to change without notice Note While all due care and attention has been taken in the preparation of this document Advance AutoQuip shall not be liable for any inaccuracies or omissions which may occur therein PARKING HOIST AutoLift FP VRC Four Post Vertical Reciprocating Conveyor Lifting Capacity Varies see specific product specifications Design Registration Approva...

Page 2: ...n snow etc THE HOIST IS NOT DESIGNED FOR OUTDOOR WASHDOWN APPLICATION WARRANTY WILL BE VOID 6 It is client s scope to make provision of power feeding to cabinet of FPVRC 7 In case of flush mounting it s strongly recommended to provide drainage in the pit to drain waters or any other fluids 2 Tools preparation Tools devices equipment and instruments including but not limit to the following are reco...

Page 3: ...riage 7 Base plate 8 Platform 9 Ramp 10 Side Beam 11 Main Beam 12 Cylinder 13 Pneumatic Cylinder 14 Fence Note No 9 Ramp will not be applicable when lift is recessed in pit No 8 Platform may be composed of two pcs only depending on platform width No 9 Ramp can be also placed at the other side as per site conditions ...

Page 4: ......

Page 5: ...Plate 2 pcs front rear in position on ground 3 2 2 Put Carriage onto the Base Plates and place head side of Carriages on the side of Post No 2 3 3 2 3 Put Platform onto Carriage and bolt them together Head Side with Chain Joint Tail Side with Roller ...

Page 6: ... 4 Front sides of Post No 3 4 and Rear sides of Post No 1 2 have anti falling locks like below 3 2 5 Connect Post No 1 2 No 3 4 by Connecting Beams 3 2 6 Install chain joints at top of Post No 1 4 with double nuts and then connect with chains The chains go through Carriages and bolted with chain joint bases at bottom of Post No 2 3 ...

Page 7: ... and connect with chain joint on Head side of Carriage 3 3 Limit switches To be installed at below two positions On Main Beam to position travel of Cylinder At bottom side of Post No 2 to stop platform when lowering to ground Detailed positions have been showed in the Fig 1 2 3 4 Wiring of chains system and grease Please refer to Fig 3 4_Chain Diagram 3 5 Pneumatic Anti falling System One set of a...

Page 8: ...Pneumatic Valve Tee Joint Four pcs of Pneumatic Cylinders are equipped on each stopping level except ground level one piece on each post Like attached photos Tee Joint is for air hoses to split air flow ...

Page 9: ...Note the black hose with Tee joint is air hose for pneumatic cylinder 3 6 Electrical wiring diagram Please refer to Electrical Diagram in the end of this manual ...

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ...rmally open SB1 SB2 KA1 KA2 KA4 KT KA1 KT YV1 21 KM1 SQ2 5 KA2 KA4 KM1 Safety valve 0 27 Lower oil valve 0 21 Warning lights 0 20 13 14 15 17 27 16 22 24 26 12 Model Lifting Capacity 3500kg Cover Area 6000 3400mm Date Country Project Drawing Pump motor 4Kw Lifting Speed 4mts min Drive Hydraulic Power Supply Projection Mode Ratio 1 1 GENERAL LAYOUT N M N A 05 08 2021 FP VRC Total Travel 4900mm Ramp...

Page 16: ...the capacity of the hoist compared to the weight of the vehicle If vehicle is too heavy do not proceed 4 Ensure the area is clean and clear of grease oil and objects that may be a slip trip hazard 5 Familiarise yourself with and check all machine operations and controls 6 Check all safety devices are in good condition 7 Ensure support arms are capable of being locked in position 8 Ensure rubber pa...

Page 17: ...ety locks tested for correct operation Checked for good working order Supplied with the hoist and in good working order Checked for correct operation Hoist checked with load for correct operation and speed control tested Checked wire ropes for correct installation and tension Concrete floor is a suitable depth for installation Safety Devices Welds Hydraulic Equipment and Controls Pneumatic Equipme...

Page 18: ...onstrated the operation of the vehicle hoist to the owner or operator Lock off isolating switch installed Emergency stop button installed 3 Details of Electrical Contractor Trading Name Address 4 Signature I being the person responsible for completing the commissioning report have exercised reasonable skill and competency when completing the report and herby certify that the vehicle hoist has been...

Reviews: