INSTALLATION
Cam Lock Test Procedure
1. Raise the hoist 1 metre from the ground.
2. Starting at the front of the hoist, position a raised floor jack under the
centre of the transverse beam.
3. With the raised floor jack in position, lower the hoist onto the floor jack
until the wire cables have gone slack. This will allow the Cam Locks to
operate.
4. With the wire cables now slack, quickly lower the floor jack so that the
Cam Locks engage the safety ladders. The Cam Locks must prevent
the hoist from lowering once the floor jack is lowered.
5. Repeat this above steps for the rear of the hoist also.
Electrical Connection
***PLEASE NOTE***
All electrical work on the hoist including motor connection & mains
supply connection must Only be performed by a qualified electrician
Important Information
It is the installers’ responsibility to ensure that all Fasteners, Nuts, Bolts
& Hydraulic Lines are checked and tightened.
It is the installers’ responsibility to train the operator(s) of this hoist and
to return the Vehicle Hoist Installation & Training Report to activate
warranty.
VOLTAGE
AMPS
240 Volt
10 AMP
415 Volt
20
AMP
16
Summary of Contents for AL-4000A
Page 10: ...Dimensions AL 4000S2 9 ...
Page 18: ...Parts List 17 ...
Page 19: ...18 ...
Page 25: ...Air Line Diagram 24 ...
Page 26: ...Electric motor jumper pins 25 ...
Page 27: ...26 ...
Page 28: ...27 ...
Page 29: ...How to operate Jack 28 ...