
30
on the control board. The higher fan speed is
achieved by connecting Y from the
thermostat to Y2 on the control board.
Motor Tap RPMs
Fan
Speed
RPM PSC
Tap
High 1200 Black
Med 950 Blue
Low 800 Red
Note: RPMs are approximate, and will vary
slightly depending on TSP across the blower
assembly
For unit operation at ISO 13256-1 rating
conditions, PSC blower motors must use
“High” Speed and 8. B through E cabinet
unit (WH015-060). WH ½ - 1 ton units may
also require specific dip-switch settings.
Please consult factory for details.
Filters
Do not operate the unit without filters in
place. Unit must be checked for correct filter
placement during startup. Operation of the
equipment without filters will result in a
clogged air coil.
Adjusting Refrigerant Charge
Unit must be operating in the cooling mode to
adjust the refrigerant charge.
Adjusting the charge of a system in the field
must be based on determination of liquid sub-
cooling and evaporator superheat. On a
system with a TXV liquid sub-cooling is
more representative of the charge than
evaporator superheat but both measurements
must be taken.
Before Charging
Unit being charged must be at or near full
load conditions before adjusting the charge.
Units equipped with hot gas reheat must be
charged with the hot gas reheat valves closed
while the unit is in cooling mode to get the
proper charge. After charging, operate the
unit in reheat (dehumidification) mode to
check for correct operation.
After adding or removing charge the system
must be allowed to stabilize, typically 10-15
minutes, before making any other
adjustments.
The type of unit and options determine the
ranges for liquid sub-cooling and evaporator
superheat. Refer to the tables below when
determining the proper sub-cooling.
Checking Liquid Sub-Cooling
Measure the temperature of the liquid line as
it leaves the refrigerant-to-water heat
exchanger.
Read the gauge pressure at the liquid line
close to the point where the temperature was
taken.
Before completing startup and leaving
the unit a complete operating cycle
must be observed to verify that all
components are functioning properly.
Due to the charge-critical nature of
these units, charge must only be
adjusted if absolutely necessary.
CAUTION
CAUTION
Summary of Contents for ProFit WH Series
Page 2: ......
Page 47: ...Literature Change History July 2022 First Version ...