Installation
AAON equipment has been designed for
quick and easy installation.
Before startup of the unit, check the supply
blower and remove the foam shipping block
that may be included to support the blower
assembly before installation, or damage may
occur.
Figure 2 - Foam Shipping Block
Locating the Unit
Placement of the unit relative to ductwork,
electrical and plumbing must be carefully
considered. Supply and return air plenum or
duct can be mounted directly to the duct
connection flanges. Use a properly sized duct
transition to connect supply duct to unit
supply air opening. Return duct flanges are
only included on units with the optional 4-
sided filter rack. Use flexible gasket material
to seal the duct to the unit.
Verify ceiling, floor, or foundation can
support the total unit weight, including
accessory weights.
To properly support the horizontal WSHP
unit and reduce sound and vibration, it must
be mounted level in both horizontal
directions. These units are designed to be
suspended via threaded rod (field provided)
through all four hanger brackets using the
four (4) vibration grommets (factory
provided) and 3/8” washers (field provided)
and as shown in Figure 3.
Figure 3 - Mounting Horizontal Units
Verify the top of the vibration grommet is
inserted into (or through) the hole provided in
the hanger bracket, as pointed out in Figure
4.
Figure 4 - Vibration Grommet Installation
The threaded rod and nut must be adequately
sized to support the total unit weight. Avoid
installing units directly above or adjacent to
sound-sensitive areas.
Threaded Rod
(Field Provided)
Nut
(Field Provided)
3/8” Washer
(Field Provided)
Vibration
Grommet