background image

www.aosmithinternational.com

Data subject to change INT/0808/EQ/02

Terms and conditions apply

, please refer to our website.

1   Pressure reducing valve
3   T&P valve
4   Stop valve
5   Non-return valve
6   Circulation pump
9   Drain valve
10  Gas cock
11  Isolating valve
14  Hot water outlets
15  Expansion relief valve
16  Expansion vessel
17  Three way valve
18  Water tank
19  Float valve

A   Cold water 
B   Hot water 
C   Return circulation 
D   Gas supply
E   Overflow pipe
H   Expansion vent pipe

A.O. Smith unvented system kits utilise 
combination valves.

An EQ / EQB water heater should be 
installed in accordance with local 
standards and ventilation requirements 
(category B11BS). 

Further installation and connection 
details can be found in the Installation 
& Commissioning Manual.

For the parts numbers of components 
please refer to the “Maintenance and 
accessories” tab.

EQ / EQB

Installation diagrams

EQ / EQB

Summary of Contents for EQ / EQB

Page 1: ...level suitable for installation in most locations Ring base for easy installation and lower heat losses Replaceable magnesium sacrificial anode Safety thermostat EQ 280 380 have access covers for waterside tank maintenance EQB maximum temperature setting of 81 C Suitable for natural or LP gas Optional ancillaries Unvented kits Destratification pump kit Powered anode Time clock kit Flue fan kit Solen...

Page 2: ... mm 1 40 1 50 1 95 2 20 2 50 1 40 1 60 1 95 Max flue gas temperature C 255 200 160 255 290 255 200 160 Draw off capacity Storage capacity l 109 144 181 265 355 109 144 181 Max temperature setting C 71 71 71 71 71 81 81 81 30 min T 44 C l 169 216 296 394 508 169 216 296 60 min T 44 C l 241 304 433 550 695 241 304 433 90 min T 44 C l 314 392 569 707 883 314 392 569 120 min T 44 C l 386 480 706 864 1...

Page 3: ...0 230 230 255 285 285 S 945 1030 1265 1380 1280 1460 1 Cold water 3 4 14 NPT EQ 280 1 11 5 NPT EQ 380 1 1 4 11 5 NPT 2 Hot water 3 4 14 NPT EQ 280 1 11 5 NPT EQ 380 1 1 4 11 5 NPT 3 Gas control Rp 1 2 4 Tank drain valve 3 4 14 NPT 5 T P valve 3 4 14 NPT Dimensions in mm All EQ water heaters receive a five years warranty on the tank and one year on parts All EQB water heaters have a one year warran...

Page 4: ...y valve 18 Water tank 19 Float valve A Cold water B Hot water C Return circulation D Gas supply E Overflow pipe H Expansion vent pipe A O Smith unvented system kits utilise combination valves An EQ EQB water heater should be installed in accordance with local standards and ventilation requirements category B11BS Further installation and connection details can be found in the Installation Commissio...

Reviews: