16
2. Access to the connection terminal for CAHP-80/120 units with following steps.
ķ
Remove the top service panel with reference to figure 4.1;
ĸ
Remove the cover of control box with reference to figure 4.1;
Ĺ
Screw out the cable connector with reference to figure 4.2.
3. Run the main power cord through the cable connector with reference to figure 4.3.
Figure 4.1 Figure 4.2
Figure 4.5
Cable Connector of
Circulating Pump
Cable Connector
of Display Box
Power Cord
Control Box Cover
Control Box Cover
Top Service Panel
Figure 4.3
Top Service Panel
Cable Connector
of Power Cord
Control Box Cover
of Display Box
Power Cord
Figure 4.6
Figure 4.4
Cable Connector of
Circulating Pump
Cable Connector
Cable Connector
of Power Cord
Summary of Contents for CAHP-120 Series
Page 1: ...R...
Page 42: ...41 8 APPENDIX 8 1 CAHP 80I 120I Wiring Diagram...
Page 43: ...42 8 2 CAHP 80T 120T Wiring Diagram...
Page 44: ...43 8 3 CAHP120C 3KW Wiring Diagram...
Page 45: ...44 8 4 CAHP120C 4KW 5KW 6KW Wiring Diagram...
Page 46: ...R...