2
TABLE OF CONTENTS
SAFE INSTALLATION, USE AND SERVICE.................................3
APPROVALS .................................................................................3
GENERAL SAFETY INFORMATION .............................................4
..............................................................................4
.............................................................4
Hydrogen Gas Flammable .......................................................4
INTRODUCTION ...........................................................................7
Abbreviations Used ..................................................................7
............................................................................7
iCOMM™ & BACnet Compatible ..............................................7
Preparing For The Installation ..................................................7
DIMENSIONS AND CAPACITY DATA ...........................................8
Rough In Dimensions: 50 Gallon Unit ......................................8
Rough In Dimensions: 75 Gallon Unit ......................................8
FEATURES AND COMPONENTS ..............................................10
...........................................................13
INSTALLATION CONSIDERATIONS ..........................................14
....................................................14
Insulation Blankets .................................................................15
Combustion Air And Ventilation ..............................................15
..................................................................16
......................................................................16
Fresh Air Openings For Confined Spaces
..............................16
Outdoor Air Through Two Openings
.......................................16
Outdoor Air Through One Opening.........................................16
Outdoor Air Through Two Horizontal Ducts
............................17
...............................................17
INSTALLATION REQUIREMENTS .............................................18
......................................................18
Water Piping ...........................................................................18
.........................................................................18
Mixing Valves..........................................................................19
Gas piping ..............................................................................19
Gas Supply Systems ..............................................................20
Gas Pressure Requirements ..................................................20
Supply Gas Regulator ............................................................20
...........................................................20
Space Heating And Potable Water System
............................21
Closed Water Systems ...........................................................21
Thermal Expansion ................................................................21
Temperature-Pressure Relief Valve ........................................22
Condensate Piping .................................................................23
High Altitude Installations .......................................................23
Filling The Water Heater .........................................................23
INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH
OF MASSACHUSETTS ...............................................................24
VENTING INSTALLATION ..........................................................25
Vent Installation Considerations .............................................25
U.S. Installations ....................................................................25
Canadian Installations ............................................................25
Polypropylene Installations .....................................................26
Vent Pipe Termination.............................................................27
Planning The Vent System .....................................................27
Installation Of Horizontal Through The Wall Vent System
Direct Vent Terminal Installation
.............................................28
.............................................................28
Termination Clearances Sidewall Power Vent
Termination Clearances Sidewall Direct Vent
Vertical Vent Terminal Installation
...........................................31
...............................................................32
....................................................33
Low Profile Termination Installation
........................................36
LIGHTING AND OPERATION LABELS .......................................37
TEMPERATURE REGULATION .................................................38
CONTROL SYSTEM OPERATION .............................................39
................................................................................39
Control System Navigation .....................................................39
User Settings & Control System Menus .................................42
FOR YOUR INFORMATION ........................................................47
Start Up Conditions ................................................................47
Operational Conditions ...........................................................47
PERIODIC MAINTENANCE ........................................................48
.....................................................48
Anode Rod INSPECTION ......................................................48
Powered Anode Rod (optional models)
..................................49
Temperature-Pressure Relief Valve Test ................................49
..............................................................49
...................................................................................50
LEAKAGE CHECKPOINTS .........................................................51
TROUBLESHOOTING ................................................................52
...............................................................52
..........................................................52
Sequence Of Operation Flow Chart
.......................................53
Operational Problems .............................................................54
Fault And Alert Conditions ......................................................55
WIRING DIAGRAM .....................................................................58
LIMITED WARRANTY .................................................................59
Summary of Contents for BTXL-100
Page 5: ...5 GENERAL SAFETY INFORMATION...