1
TABLE OF CONTENTS
INTRODUCTION .......................................................................................2
Qualifications
........................................................................................2
Service Warning
...................................................................................2
Service Reminder
.................................................................................2
Tools Recommended
............................................................................2
INSTALLATION CONSIDERATIONS ........................................................3
Instruction Manual
................................................................................3
Closed Water Systems
.........................................................................3
Thermal Expansion
...............................................................................3
Air Requirements
..................................................................................3
Contaminated Air
..................................................................................3
FEATURES AND COMPONENTS
............................................................4
Combustion Blower & Burner Assembly
...............................................4
Top View: BTH 120 - 250 Models
.........................................................5
Top View: BTH 300 - 500 Models
.........................................................5
SEQUENCE OF OPERATION FLOW CHART ..........................................6
FAULT AND WARNING CODES ...............................................................7
1. Low Gas Pressure
............................................................................7
High Altitude
.................................................................................7
Gas Pressure Specifications
........................................................7
Gas Supply Systems
....................................................................8
Supply Gas Regulator
..................................................................8
Gas Pressure Test ........................................................................9
2. Blower Operation Error
...................................................................11
Pressure Switches
.......................................................................11
Control System Monitoring
...........................................................11
Pressure Switch Tests
..................................................................12
Continuity Test During Standby
....................................................12
Continuity Test During Operation
.................................................13
Pressure Test During Operation
...................................................13
Pressure Switch Settings
.............................................................14
3. Blower Prover Open
.......................................................................16
4. Ignition Failure
................................................................................17
5. Blocked Air Intake
...........................................................................20
6. Blocked Exhaust
.............................................................................21
7. Flame Sensor Error
........................................................................22
Gas Control Valve
........................................................................22
Gas Control Valve Voltage Tests
..................................................23
Flame Sensor
...............................................................................24
Flame Sensing Operation
............................................................24
Flame Sensing Current Test
.........................................................25
8. No Water
.........................................................................................26
Powered Anodes
..........................................................................26
Power anode cleaning and removal
.............................................26
9. Anode Shorted
................................................................................28
10. Temperature Probe Short (Upper or Lower)
.................................29
Temperature Probe
......................................................................29
Temperature Sensor Test
.............................................................30
ECO Continuity Test
.....................................................................30
11. Temperature Probe Open (Upper or Lower)
.................................32
VENTING
.................................................................................................33
General Venting Information
........................................................33
INTAKE AIR CONNECTION ....................................................................34
ELECTRICAL CONNECTIONS – ALL MODELS
.....................................35
Electrical Wiring
..................................................................................35
Power Supply Connections
................................................................35
Enable/ Disable Switch
.......................................................................36
Power Supply Test
..............................................................................36
INSTALLATION CHECK LIST .................................................................37
OPERATION AND SERVICE
..................................................................38
How It Works
......................................................................................38
Combustion Blower
............................................................................38
Modulation
..........................................................................................38
BLOWER SPEED CONTROL – BTH 300 THRU 500
.............................40
VARIABLE FREQUENCY DRIVE – BTH 300 THRU 500
........................41
BURNER ASSEMBLY
.............................................................................42
COMBUSTION BLOWER AND BURNER REMOVAL/ INSTALLATION
INSTRUCTIONS ......................................................................................43
SPARK IGNITER .....................................................................................44
GAS ORIFICE - BTH 300 THRU 500 MODELS
......................................46
Orifice Chart - BTH 300 thru 500 Models
...........................................46
CCB (CENTRAL CONTROL BOARD)
.....................................................47
CCB Cover Removal And Replacement
.............................................48
CCB Circuit Board Layout
..................................................................49
CCB Connection Identification
............................................................50
WIRING DIAGRAM – BTH 120 THRU 250
.............................................52
WIRING DIAGRAM – BTH 300 THRU 500
.............................................53
CONTROL OVERVIEW
...........................................................................54