How to install foot fixture
Remove screws at the bottom of machine back. Take foot fixture out of accessory bag
and fix it on the machine. Then screw on and Fix it on the floor with plastic expansion screw
(See Diagram 9)
Please confirm whether water pipe is connected properly and whether there is water/
power supply. Please confirm whether water pipe is connected properly and whether there is
water/ power supply. Then follow below adjustment procedures.
6)
To prevent some activated carbon from entering
into pure water tank when post activated carbon is
used for the first time, after finishing the installation
of filter and RO membrane, cut off a certain length
of 1/4'' water pipe and connect it into outlet end of
post activated carbon. Then turn on inlet valve and
inlet switch (Diagram 10) and switch the power on.
Flush RO membrane and post activated carbon for
15mins and connect it to former 1/4''pipe. Continue
to product water. When water production stops,
turn on hot water switch. Press room temperature
water button and hot water button to release
corresponding water.
1)
Adjustment Procedures
Diagram
8:
Total have 4 O rings
Membrane housing
Water inlet
Reverse osmosis membrane
Membrane housing
cover
Water
inlet
Waster water
outlet
pure water
outlet
16
Foot fixture
Diagram
9
Diagram
10
Tee joint
Turn on
Turn off
Summary of Contents for ADR75-V-ET-1
Page 1: ...MODEL ADR75 V ET 1...
Page 2: ...2...
Page 3: ...3...
Page 22: ...WarrantyTerms Conditions 22...
Page 23: ...23 ADR75 V ET 1...
Page 24: ......