Operating and Assembly Instructions – A.B.S. Flexilo
TROUGH for wood pellets
Final inspection
Subject to technical change
Issue 09/2016
Page 22 of 33
©A.B.S. Silo- und Förderanlagen GmbH
Attaching the silo cover to the ceiling
5.5 Fastening
Firmly tighten all screwed connections.
Fasten the frame to the floor.
Earth all steel parts as described in chapter “Earthing”.
5.6 Mounting of Filling-set(s)
1. Using the illustration below as a reference, assemble the individual components of
the filling line with the aid of the clamp rings. Earth the filling-set as described in
chapter Earthing.
I.
II.
Pay attention that the rubber lip
shows inside.
Please cover the sealing ring over
the end of the metal pipe in the
intended nut of the sealing ring.