95Power VDI-35 User Manual Download Page 12

深圳市微能信息科技有限公司

95Power Information Technology Co., Ltd

VDI-35-

用户手册

User manual

12 / 13

VDI-35-UM-005,A/1

3.

使计算机远离高温,潮湿以及灰尘。

/ Keep the computer from heat, humidity and dust.

4.

切勿撞击、跌落计算机,避免损坏。

/ Do not hit or drop the computer to avoid damage.

5.

切勿将任何液体泼洒到计算机上,避免损坏计算机或引起燃烧。

/ Do not spill any liquid on the

computer to avoid computer damage or combustion.
6.

切勿将任何物体塞入计算机的通风口或者其他敞开的开槽内。、

Do not plug any object into the

computer vent or other open slots.
7.

确保电源线没有放在容易绊倒人或被人踩踏的位置。

/ Make sure the power cord is not in a position

where it is easy to trip or be trampled.
8.

如果长时闲下来不打算使用计算机,请将插头拔下。

/ If you do not planning to use a computer for a

long time, unplug the plug.
9.

切勿自行拆卸计算机,为了安全起见,请交给合格的专业人员来服务。

/ Do not disassemble the

computer by yourself. For safety reasons, please give it to qualified professionals.

8

订购信息

/Order information

型号

CPU

内存

存储

显示

USB COM LAN

电源

VDI-35

-001

Intel Celeron

Processor J1800

双核(

2.41GHz

1*DDR3L1066/
1333/1600MHz

SODIMM

MAX 8G

1*2.5DHH

1*mSATA

1*VGA

1*HDMI

4

2

2

DC

12V,3A

VDI-35

-002

Intel Celeron

Processor J1900

四核(

2.0GHz

4

2

2

DC

12V,3A

VDI-35

-003

Intel Celeron

Processor N2815

双核(

1.86GHz

4

2

2

DC

12V,3A

VDI-35

-004

Intel Celeron

Processor N2930

四核(

1.83GHz

4

2

2

DC

12V,3A

VDI-35

-005

Intel Celeron

Processor J2900

四核(

2.41GHz

4

2

2

DC

12V,3A

Summary of Contents for VDI-35

Page 1: ...VDI 35 User manual 1 13 VDI 35 UM 005 A 1 VDI 35 VDI 35 Industrial PC User Manual Document information Title VDI 35 VDI 35 Industrial PC User Manual Document type User Manual Document number WN 230300...

Page 2: ...may in whole or in part be subject to intellectual property rights Reproduction use modification or disclosure to third parties of this document or any part thereof without the express permission of 9...

Page 3: ...r manual 3 13 VDI 35 UM 005 A 1 Contents 1 Product profile 4 2 Features 4 3 Interfaces instruction 5 4 Specifications 6 5 System operation instructions 8 6 Simple troubleshooting 10 7 Safety warning 1...

Page 4: ...strong solid mechanism Generally the industrial microcomputer has been installed with a built in Ubuntu system and the RTLS program software has been configured for self start 1 Figure 1 Product pictu...

Page 5: ...VDI 35 User manual 5 13 VDI 35 UM 005 A 1 3 Interfaces instruction Note The following introduction is the model of the company s series products the specific model is subject to the packaging Front v...

Page 6: ...he RJ 45 interface Connect the computer to the Ethernet network over the network cable 7 VGA VGA interface Connect the display 8 HDMI HDMI interface Connect the display 9 Power interface Connect the p...

Page 7: ...d Mini PCIE 1x Mini PCIE HDD SATA 2 5 HDD SATA 2 0 SSD 1x mSATA socket Software OS Windows7 Windows8 Windows10 Linux Ubuntu LINUX CENTOS Power Power type DC IN 5 5 2 5 Input voltage 12V Minimum power...

Page 8: ...press the power button and the power indicator blinks and gives a prompt tone 2 uwb 123456 2 If manual maintenance is needed you can connect the video output line to the monitor and the keyboard and m...

Page 9: ...machine to insert into the network cable the uplink terminal needs to have the DHCP function and the industrial control machine can automatically obtain the IP address To view the IP address of the in...

Page 10: ...nt and password The default account is admin and the default password is 123456 Subsequent operations can be conducted according to the _UWB 6 Simple troubleshooting Fault performance The exclusion me...

Page 11: ...the computer is still not responding unplug the AC power adapter 3 1 After 1 minute plug in the adapter and boot it again If it cannot be started please send it to repair 5 There is no sound from the...

Page 12: ...ed 8 If you do not planning to use a computer for a long time unplug the plug 9 Do not disassemble the computer by yourself For safety reasons please give it to qualified professionals 8 Order informa...

Page 13: ...005 A 1 9 Contact information 95Power Information Technology Co Ltd 9 6 Address 6 Floor Building 9 Lijincheng Scientific Technical Park Gongye East Road Longhua District Shenzhen Tel 86 755 23779409 F...

Reviews: