© 84 Engineering 2021
Page 7 of 14
3.
Assembly
3.1. Component assembly
Your Shop Mate comes fully assembled other than the fitting of the top of the gas strut (No. 6)
to the tension arm (No. 17). This is done by screwing in the mounting bolt and securing with a
12mm spanner.
3.2. Component assembly
Figures 1 to 5 below show the detail assembly of the Shop Mate 48. A full parts list for the Shop Mate
48 grinder is shown in Table 2 below.
NOTE:
The parts list covers the base grinder components only.
Figure 1 – 48” Grinder Body Assembly (refer Table 2 for parts list)
Refer Figure 2