
- 3 -
8 Corresponding connections in MDI. 1→3, 2→6, 3→1, 4→7,
5→8, 6→2, 7→4, 8→5, are used as cross wiring in the MDI-X
port of Converter and HUB. In MDI/MDI-X, 100/1000Base-TX
PIN defines is as follows:
PIN
MDI
MDI-X
1
BI_DA+/TX+
BI_DB+/RX+
2
BI_DA-/TX-
BI_DB-/RX-
3
BI_DB+/RX+
BI_DA+/TX+
4
BI_DC+/
BI_DD+/
5
BI_DC-/
BI_DD-/
6
BI_DB-/RX-
BI_DA-/TX-
7
BI_DD+/
BI_DC+/
8
BI_DD-/
BI_DC-/
Note
10Base-T/100Base-TX, “TX
”transmit data
, “RX
”receive data
,
“
”not use.
10/100Base-T(X) MDI (straight-through cable)
10/100Base-T(X) MDI-X (Cross over cable)
Gigabit MDI (straight-through cable)
Gigabit MDI-X (Cross over cable)
MDI/MDI-X auto connection makes switch easy to use for
customers without considering the type of network cable.
1000Base SFP fiber port(mini-GBIC)
1000Base-X SFP fiber port adopts Gigabit mini-GBIC
transmission, can choice different SFP module according to
different transfer distance. Fiber interface must use for pair, TX
port is transmit side, must connect to RX (receive side). The fiber
interface support loss line indicator.
Suppose
: If you make your own cable, we suggest labeling the
two sides of the same line with the same letter (A-to-A and
B-to-B, shown as below, or A1-to-A2 and B1-to-B2).
LED Indicator
LED indictor light on the front panel of product, the function of
each LED is described in the table as below.
System indication LED
LED
State
Description
P1
ON
Power is being supplied to power
input PWR1
OFF
Power is
not
being supplied to
power input PWR1
P2
ON
Power is being supplied to power
input PWR2
OFF
Power is
not
being supplied to
power input PWR2
Alarm
ON
When the alarm is enabled, power
or the port’s link is inactive.
OFF
Power and the port’s link is active,
the alarm is disabled.
Run
ON/OFF
System is not running well
Blinking
System is running well
Link/ACT
(G1~G12)
ON
Port connection is active
Blinking
Data transmitted
OFF
Port connection is not active
Installation
Before installation, confirm that the work environment meet the
installation require, including the power needs and abundant
space. Whether it is close to the connection equipment and other
equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or
the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4. Power: support 12 ~ 48VDC power supply
1
8