background image

 

Model I 

 

Model II, Model III 

1. 

Copper port rate status indicator 

2. 

Fiber port rate status indicator 

3. 

Copper port connection status indicator 

4. 

Fiber port connection status indicator 

5. 

Power supply indicator 

6. 

Copper port working mode indicator 

7. 

Hanger 

8. 

100M fiber port 

9. 

100M copper port 

10. 

External  DC  round  head  power  supply  input 

terminal 

11. 

AC outlet 

12. 

AC outlet switch 

13. 

Built-in 48VDC power supply input terminal 

Mounting Dimension

 

Unit: mm 

 

Model I

 

 

Model II, Model III 

Notice before mounting:

 

 

Don't  place  or  install  the  device  in  area  near  water  or 

moist,  keep  the  relative  humidity  of  the  device 

surrounding between 5%~95% without condensation. 

 

Before  power  on,  first  confirm  the  supported  power 

supply specification to avoid over-voltage damaging the 

device. 

 

The  device  surface  temperature  is  high  after  running; 

please don't directly contact to avoid scalding. 

Wall-mounting the Device

】 

Step 1 

Put  the  device  on  the  wall  it  will  be  mounted  as 

reference or to refer to its mounting dimension, and 

mark the locations of 2 expansion screws. 

Step 2 

Put the device on the marked wall and tighten the 

screws  toward  the  marked  locations,  mounting 

ends. 

 

Disassembling the Device

 

Step 1 

Device powers off 

Step 2 

Hold  the  device  steady  and  unscrew  the  nuts  on 

the wall.   

Step 3 

Take out the device, disassembling ends. 

Notice before powering on

 

 

Power ON operation: first connect power line to the 

connection terminal of device power supply, then power 

on. 

 

Power OFF operation: first unpin the power plug, then 

Reviews: