Table 2 – Inspection & Maintenance Log
Serial Number(s):
Date Purchased:
Model Number:
Date of First Use:
Inspected By:
Inspection Date:
Component:
Inspection:
Before
Each Use
Competent
Person
Carabiners
Hooks
(Figure 8)
Inspect Snap Hooks, Carabiner, Rebar Hooks, etc. for signs of
damage, corrosion, and proper working condition. Where present:
Swivels (A) should rotate freely, and Carabiner and Hook Gates (B)
should open, close, lock, and unlock properly.
Web Lanyards
Webbing and Stitching
(Figure 9)
Inspect webbing; material must be free of cuts (A), frays (B), or
broken fibers. Check for tears, abrasions, heavy soiling (C), mold,
burns (D), or discoloration. Inspect stitching; Check for pulled or cut
stitches. Broken stitches may be an indication that the harness has
been impact loaded and must be removed from service.
Rope Lanyards
Rope and Thimbles
(Figure 10)
Inspect the rope, material must be free of frayed strands, broken
yarns, cuts, abrasions, burns, discoloration, chemical or heat damage
(indicated by brown, discolored, or brittle areas), and ultraviolet
damage (indicated by discoloration and the presence of splinters
and slivers on the rope surface). The rope must be free of knots,
excessive soiling, heavy paint buildup, and rust staining. Rope splices
must be tight, and thimbles must be held by the splice. Cracked or
distorted rope thimbles may indicate that the Rope has been impact
loaded. Damaged or questionable ropes must be removed from
service.
Labels (Figure 11)
All labels should be present and fully legible.
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Summary of Contents for PROTECTA 1260200
Page 3: ...3 2 3 4 5 A B C 6 7 A B ...
Page 4: ...4 8 9 10 B B B A B C D D C B A 11 13 1 3 4 9 12 10 11 2 5 6 7 8 2 ...
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......