4
4.0 Air Supply Requirements
For maximized operation, the 3M
™
Ionized Air Gun 980 should be supplied with
clean, dry air, or nitrogen.
Please note that the failure to use clean, dry air or nitrogen may result in
damage to the Ionized Air Gun 980 that will not be covered by warranty.
5.0 Installation
Choose a location convenient to the work
area and to the air supply. The console
takes up very little space and is
adaptable to a variety of permanent or
nonpermanent installations. To minimize
bends in the air Ionized Air Gun 980
hose, orient the console so that the open
end that accepts the filtered air hose to
the hand unit points toward the work area,
and the male connector points toward the
air supply. See Figure 1.
5.1 Mounting the Console
Prior to mounting, plug the end of the 10 foot (3 m) RJ-11 cable from the power
supply into the jack on the back of the console. Lay the cable inside the groove
inside the console. Mount the console using the instructions below.
5.2 Permanent Mounting
• Attach the supplied mounting plate to the threaded holes on the back of the
console, using the supplied screws. See Figure 1.
• Attach the plate to a flat surface, such as a wall or back of a workbench, using
suitable screws and fasteners. When mounting to a hollow wall, be sure to use
adequate screws and wall anchors to ensure stability of installation.
Figure 1