78-8127-8867-3-B
5
2.7 Apply a Scotch® Mastic Sealing Strip 2230 over the previously applied mastic strip and overlapping onto the
cable jacket. Knead mastic around neutral wires. Overwrap mastic with vinyl tape, taking care not to extend
tape along neutral wires
(Figure 5).
Scotch
®
Mastic Sealing Strip 2230
Overwrap with vinyl tape
Cable Jacket
Figure 5
2.8 Clean or cover cable jacket 30" (760 mm) from jacket edge on side where splice body will be parked.
2.9 Slide integrated splice body onto clean cable jacket, loose core end first
(Figure 6).
Loose core end
Integrated splice body
Cleaned cable jacket
Figure 6
3.0 Install Connector
Note: If using a crimp-type connector, go to step (3.3).
3.1 If using a 3M
™
Shearbolt Connector QCI 2-250,
refer to the instructions included with the connector for
insulation cut-back dimension. Insulation removal length shall not exceed 2 1/2" (64 mm) from conductor end
(Figure 7).
Refer to connector instructions for dimensions
Figure 7
Summary of Contents for 5415A-IJ
Page 15: ...78 8127 8867 3 B 15 ...