8
78-8096-4635-5-C
1/2"
For UniShield
®
1/2"
Scotch
®
Super 33+™ Vinyl Electrical Tape
Figure 9c
7.0 Install Lugs
7.1 Install and crimp lugs per manufacturer’s direction; see back page if 3M
™
Scotchlok
™
Lugs are used.
7.2 FOR 8kV ONLY. Fill lug/insulation gaps with Scotch
®
Linerless Rubber Splicing Tape 130C (Figure 10).
Large Lug
Small Lug
Scotch
®
Linerless Rubber Splicing Tape 130C
Scotch
®
Linerless Rubber Splicing Tape 130C
Figure 10
7.3 Bolt lugs together. See Table 1 on cover for maximum bolt length. See Figure 11 for proper bolt/lug
arrangement.
Large Lug
Small Lug
Bolt Should Be Inserted Thru
Hole Of Smaller Lug First
Washer
Figure 11