Table 2 – Inspection & Maintenance Log
Serial Number(s):
Date Purchased:
Model Number:
Date of First Use:
Inspected By:
Inspection Date:
Component:
Inspection:
Before
Each Use
Competent
Person
Carabiners
Hooks
(Figure 8)
Inspect Snap Hooks, Carabiner, Rebar Hooks, etc. for signs of damage,
corrosion, and proper working condition. Where present: Swivels (A)
should rotate freely, and Carabiner and Hook Gates (B) should open,
close, lock, and unlock properly.
Web Lanyards
Webbing and Stitching
(Figure 9)
Inspect webbing; material must be free of cuts (A), frays (B), or broken
fibers. Check for tears, abrasions, heavy soiling (C), mold, burns (D), or
discoloration. Inspect stitching; Check for pulled or cut stitches. Broken
stitches may be an indication that the harness has been impact loaded
and must be removed from service.
Rope Lanyards
Rope and Thimbles
(Figure 10)
Inspect the rope, material must be free of frayed strands, broken yarns,
cuts, abrasions, burns, discoloration, chemical or heat damage (indicated
by brown, discolored, or brittle areas), and ultraviolet damage (indicated
by discoloration and the presence of splinters and slivers on the rope
surface). The rope must be free of knots, excessive soiling, heavy paint
buildup, and rust staining. Rope splices must be tight, and thimbles must
be held by the splice. Cracked or distorted rope thimbles may indicate
that the Rope has been impact loaded. Damaged or questionable ropes
must be removed from service.
Labels (Figure 11)
All labels should be present and fully legible.
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date: