
Use hammer drill to secure post.
3
Secure ILTUO Vertical Post with 1 Glazing Channel and 2 Rivet Nuts to Floor
4
Install First Varia Panel
Installation
(×48) Pilot Holes
Dashed lines shown
for reference only
Door
*Flat side of post needs
to face the door opening
*Vertical Post with 2 rivet nuts
must be at the center position
of wall on the door side
(×
4) 3-
15-
230
9
or 3-
15-
23
10
1
(×2)
3-15-2114
3-15-2171
2
Door
For more information, please visit 3-form.com or call 800.726.0126
December 2018 | mAN-rTG-200-62 | reV 002 © 2018 3form, Inc. All rights reserved.
7