Installation
1
Drill Pilot Holes (�48)
Two standard template parts will be provided;
a base plate template (3-15-2160) and a corner
template (3-15-2340). The base plate template
has hole locations for drilling. Spacers will also be
provided, unique to this configuration; cut to size
based off post dimensions in the quoting phase.
Layout the whole floor plan
using the template.
a
Following the ILTUO Installation Template, drill pilot
holes. Use appropriate pilot hole diameter and depth for
the type of substrate you are fastening to.
*3form stocks the drill bits required for the concrete
and wood pilot holes. If you wish to purchase a drill bit,
please contact your 3form sales representative.
b
Ø
Depth
Anchors
concrete
8mm
min 4.3"
3-15-2309
Wood
3/16"
min 3.5"
3-15-2310
Substrate
Drill Bit
3-15-2350
3-15-2335
ILTUO Installation
Template - Base Plate
3-15-2160
ILTUO Installation
Template - Corner
3-15-2340
ILTUO Installation Template
- Template Spacer
3-15-2347
2
Assemble Vertical Posts (�12)
Glazing Channel
3-15-2009
Vertical P
ost,
1 Glazing Channel, 96
"
(×2) Screw
3-15-2308
(×2) Glazing Channel
3-15-2009
(×2) Screw
3-15-2308
ILTUO
Base Plate
3-15-2110
ILTUO V
ertical P
ost,
2 Glazing Channels, 96
"
ILTUO
Base Plate
3-15-2110
For more information, please visit 3-form.com or call 800.726.0126
December 2018 | mAN-rTG-200-62 | reV 002 © 2018 3form, Inc. All rights reserved.
6