TD_UserManual_SCALEREO-Desk_13xyyC
Rev. 1.4 / 25.02.2022
14
/ 29
3. Commissioning
3.1 General instructions
To achieve the best possible results with your system, please observe the following
general instructions:
•
The optimum image quality on the display is achieved after a warm-up period of approx.
20-30 minutes.
•
Make sure that your system is positioned so that the display is operated at an angle of
90° to windows and other light sources in order to avoid reflections on the display.
•
Observe the generally applicable or, if applicable, in-house recommendations for the
ergonomic configuration of a workplace also for the installation of this system.
•
Keep the system clean at all times and avoid soiling of any kind, especially in the area
of the camera, the screen surface and the operating unit. For instructions on cleaning,
please refer to paragraph 7.2 on page 28.
•
Relax your eyes at regular intervals by focusing on a distant real object for some time.
Blink more frequently. Regular breaks are recommended when using the device.
3.2 Unpacking & installing
To avoid damage to the system, the individual devices must be unpacked and in-
stalled and the cables connected as described here.
Please adhere closely to the sequence given here!
The parts of the system are delivered in 2 separate boxes (see paragraph 1.3.2 / page 6).
3.2.1 Unpacking box 1
•
Open the upper side of box 1.
•
Remove the user manual and read it carefully.
•
Remove the upper foam padding.
•
Remove the ControlBar and the cables and place them near the intended installation
location.
•
Remove the signal processing unit (SPU) and place it at its intended installation location.
•
Grasp the 3D display/tracking unit only by the rear arm of the stand (
NEVER by the
display proper
as this could damage the device!). Carefully remove the device and set
it down at its intended installation location.