P R E P A R I N G F O R I N S T A L L A T I O N
Figure 14 Switch 7700 placement
4.3. Installation Tools
Table 24 provides a list of the tools you need to install the Switch 7700.
Table 24 Required installation tools
Measure and
lineation tools
Long tape, ruler (of 1 meter), gradienter, marking pen, powder marker
and pencil
Drills
A percussion drill, several auxiliary drill bits, a vacuum cleaner
Fastening tools
Flat-blade screwdriver P4-75mm
Phillips screwdriver P1-100mm, P2-150mm and P3-250mm
Socket wrench M5
Box-end wrench M6
Box-end wrenches (10-12) or open-end wrench (10-12)
General tools
Small tools
Sharp-nose pliers, diagonal pliers, vices, hand-held electric drill, file,
handsaw, crowbar and rubber hammer
Special tools
Anti-static wrist strap, cable stripper, crimping pliers, RJ-45 crimping pliers and wire punchdown
tool
Instruments
Multimeter, 500V Meg-ohmmeter (used to measure the insulation resistance), error detector,
optical power meter and earth resistance tester
27