20
4-Port Gigabit Ethernet Layer 3 Switching Module (GBIC) Quick Start Guide
Module Initialization Process
After the EME enables power to the slot, the module initialization process
begins and lasts up to 4 minutes. The following activities occur:
■
The Module Status LED flashes on (using colors yellow and green) and
off throughout the entire initialization process, although periods in the
off state may last up to 25 seconds.
■
The Port Status LEDs flash on (using colors yellow and green) and off,
but they finish their sequence earlier than the Module Status LED and
they remain off until you connect cabling and establish links.
■
Toward the end of the module initialization process, the
corresponding LED on the GEN Switch Fabric Module (which is listed
in Table 1, Table 2, Table 3, Table 4, and Table 5 earlier in this guide)
lights green. The module initialization process completes a few
seconds later.
Successful Initialization
If no problems exist at the completion of the module initialization
process, you see the following indicators:
■
The Module Status LED lights green.
■
The module’s Port Status LEDs remain off until you attach cabling and
establish links.
■
The corresponding Port Status LED on the GEN Switch Fabric Module
flashes green.
After you attach cabling and establish links, the module is ready to
configure. See “Managing the Module” later in this guide.
Summary of Contents for 3CB9RG4