Installing in the 4- or 8-Slot Chassis
1-3
Installing in the 4- or
8-Slot Chassis
To install the DPE module into the NETBuilder II 4- or 8-Slot chassis, follow these
steps. If you own the Extended chassis, refer to the next section.
Although it is not required, 3Com recommends that you turn off the system
before you install or remove a DPE module. If you do not turn off the system,
the bridge/router will automatically reset when you install the DPE module.
You will need a small, flatblade screwdriver.
1
Insert the module into the top slot.
Although the figure shows an 8-Slot chassis, the procedure for the 4-Slot
chassis is exactly the same.
2
Hand-tighten the captive screws, then gently tighten them with a small
(1/8 in. – 3/16 in.) screwdriver. Do
not
overtighten the screws.
A solid connection of the front panel to the chassis is required for proper
operation. Do
not
use the screws to force the board into place.
You are now ready to install the I/O modules. Refer to the appropriate I/O
module installation guides. After installing your I/O modules, refer to
“Connecting a PC, Terminal, or Modem” on page 1-5.
c
a
b
d
1
2
3
4
8
7
6
5
®
DPE
PACKET
FORWARD
POWER/
FAULT
RUN
LOAD
TEST
RESET ATTENTION
4
3
2
1
STATUS
CONSOLE
A
B
Grasp left
and right
sides of
LED panel.
Make sure module
is right side up.
Push ejector tabs all
the way closed until the
module is flush with the chassis.
Slide module along
guide rails until it
engages the notches
of ejector tabs.
Summary of Contents for 3C6090 - NETBuilder II Dual Processor Engine Router
Page 6: ...2 ABOUT THIS GUIDE ...
Page 16: ...1 10 CHAPTER 1 INSTALLING THE DPE MODULE ...
Page 24: ......
Page 32: ...2 INDEX ...
Page 34: ......