![360 YIELD CENTER 360 Y-DROP Assembly Instructions Manual Download Page 3](http://html.mh-extra.com/html/360-yield-center/360-y-drop/360-y-drop_assembly-instructions-manual_440300003.webp)
1.
From center of the machine, there are five (5) mounting zones
on each of the primary side booms (first fold) in which the
mounting brackets will be installed. This depends on the width
of your boom and account for both 20” & 30” row spacing.
Extend the right and left primary booms (first fold) and
measure from machine center, marking both ends of each of
the following zones on both right and left primary booms:
1.
Zone 1: 80”-90” from center
2.
Zone 2: 120”-140” from center
3.
Zone 3: 180”-200” from center
4.
Zone 4: 240”-260” from center
5.
Zone 5: 300”-320” from center
Summary of Contents for 360 Y-DROP
Page 1: ...2015 360 Y DROP ASSEMBLY INSTRUCTIONS CASE 80 90 BOOM ...
Page 6: ...FIG 4b FIG 4c ...
Page 12: ...2 SecHon Yokes FIG 10b ...
Page 17: ......