360 YIELD CENTER 360 Y-DROP Assembly Instructions Manual Download Page 15

17.

Attach riser tube assembly to 360 Y-DROP base unit using stainless 

steel wire lock pin, 

 shown in FIG 13a & 13b

.  

Repeat for every drop. 

FIG   13a   

FIG   13b   

Summary of Contents for 360 Y-DROP

Page 1: ...2015 360 Y DROP ASSEMBLY INSTRUCTIONS CASE 80 90 BOOM ...

Page 2: ...embly of the system to the sprayer This will give good guidance for mounting the system to your sprayer boom There are however numerous permutations of booms among all sprayer models it could very well be that your sprayer is not identical to the model in the following steps of the guide and pictures may differ from yours While these steps will help you install most of your 360 Y DROP system you m...

Page 3: ...the width of your boom and account for both 20 30 row spacing Extend the right and left primary booms first fold and measure from machine center marking both ends of each of the following zones on both right and left primary booms 1 Zone 1 80 90 from center 2 Zone 2 120 140 from center 3 Zone 3 180 200 from center 4 Zone 4 240 260 from center 5 Zone 5 300 320 from center ...

Page 4: ...cket in Zone 1 on the boom and leave loose shown in Fig 2 1 One 1 6 z slider bracket 2 Two 2 5 top plates 3 Two 2 3 8 x 4 bolts 4 Four 4 3 8 flat washers 5 Two 2 3 8 lock washers 6 Two 2 3 8 nuts FIG 2 5 Top Plate 6 z slider ...

Page 5: ...d boom to check clearances and tighten Distances between brackets may vary depending on your specific boom Be sure to take into account where your drops will fall 5 Repeat STEPS 2 4 on the other boom fold 6 Install two 2 mounting brackets on center section and tighten right side is shown in FIG 4a 4b 4c 1 Two 2 6 z slider brackets 2 Four 4 6 plates 3 Four 4 4 5 bolts 4 Eight 8 3 8 flat washers 5 F...

Page 6: ...FIG 4b FIG 4c ...

Page 7: ...3 4 stop bolts and nuts 8 Install 3 z slider brackets and stop bolts on all z bars shown in FIG 5 1 Twelve 12 3 z slider brackets 2 Twelve 12 5 16 x 3 4 stop bolts and nuts 9 Install and tighten 3 8 set screws with jam nuts in all z slider brackets shown in FIG 6 three per 6 z slider two per 3 z slider 1 60 3 8 set screws 2 60 3 8 jam nuts 3 8 Set Screw nut 3 Z slider FIG 5 FIG 6 ...

Page 8: ...30 or 36Rx20 drops Assemble this shorter section to the inner part of both boom folds In total the 360 Y DROP boom should span 22 1 2 feet example shown in FIG 7 The center section will take 2 5 5 boom sections Cap the ends of boom sections with rubber cap 1 5 Boom Section 2 8 connector bar 3 3 8 x 1 3 4 stainless steel flange bolt 4 3 8 flat washer 5 3 8 lock washer 6 3 8 nut 7 1 1 4 square rubbe...

Page 9: ... left right upper sprayer boom shown in FIG 8 Note Length will need to be adjusted to fit distance between booms 1 2 23 Yoke straps 2 4 Yoke ends 3 4 3 8 x 1 1 4 carriage bolts 4 2 3 8 x 1 1 4 bolts 5 6 3 8 flat washers 6 6 3 8 lock washers 7 6 3 8 nuts 8 2 3 5 locking clip pin FIG 8 ...

Page 10: ...ight hand sprayer boom and 360 Y DROP boom as shown in FIG 9a 9b spaced evenly along each side Adjust length of each yoke as required to support the square 360 Y DROP boom Secure with 3 5 locking clip pin at top and boNom of yoke FIG 9b FIG 9a ...

Page 11: ...P boom shown in FIG 10a 10b Note Length will need to be adjusted to fit distance between booms 1 2 23 yoke straps 2 4 yoke ends 3 4 3 8 x 1 1 4 carriage bolts 4 2 3 8 x 1 1 4 bolt 5 6 3 8 flat washers 6 6 3 8 lock washers 7 7 3 8 nuts 8 2 3 5 locking clip pin FIG 10 ...

Page 12: ...2 SecHon Yokes FIG 10b ...

Page 13: ...1 Quantity and spacing will depend on your system configuration and application profile 1 Riser mount brackets 2 5 16 x 1 3 8 U Bolts 3 5 16 flat washers 4 5 16 lock washers 5 5 16 nuts 15 From center of machine measure appropriate distance based on row spacing and tighten u bolts on riser mount brackets FIG 11 FIG 5 ...

Page 14: ...16 Assemble drag hoses to 360 Y DROP base unit shown in FIG 12 using hose clamps provided FIG 12 ...

Page 15: ...17 Attach riser tube assembly to 360 Y DROP base unit using stainless steel wire lock pin shown in FIG 13a 13b Repeat for every drop FIG 13a FIG 13b ...

Page 16: ... on the 360 Y DROP boom with stainless steel wire lock pin as shown in FIG 17a 17b Repeat for every drop 19 Connect and route riser hoses from 360 Y DROP base unit up riser and connect to sprayer nozzle body Zip tie hoses at least every 18 along riser tube 14a 14b ...

Page 17: ......

Reviews: