
8
9
2VV.
Creating innovative solutions for you and your business since 1995.
ver.2 09-12-19
1) Allocate wholes on the wall and screw in
2) Screw in upper screws to the heater and leave
holders
space for holder insertion ca 1/3 of the screw length
3) Put the unit on holders and screw it in
4) Screw lower screws on + pad and check tightness
of all screws
6. INSTALLATION
6.1-2.2 Install the unit on the wall
1/3
1
3
4
2
It must be fixed firmly to the wall!
Use quality connecting material for anchor-
ing!