background image

14

15

2VV.

 Creating innovative solutions for you and your business since 1995.

ver.2 09-12-19

7. FIRST START-UP

Check the following before you put the heater unit into operation.

• 

Whether no tools or other subjects that could damage the unit were left inside the unit.

• 

Whether the el. power, or heating water, is supplied correctly.

• 

Whether the heater unit is duly covered.

• 

Whether the regulation is connected correctly.

7.1 ACTIVATION

Verify basic functions of the device (fan operation, heating) by first activation. Verify other possible settings 

and functions of the product according to the manual to the regulation used.

7.2 SETTING THE DIRECTION OF EXHAUST AIR (

FOR

 

ADjUSTAbLE

 

LATHS

)

Make the setting by deflection of laths in the direction required.

 

Laths must be always open when the unit is in operation!

Or set up using the bracket 15° or 30°

30°

15°

Summary of Contents for SAV-2-AC

Page 1: ...ver 2 09 12 19 SAVANA INOX Plus INSTALLATION AND OPERATION P03 0109 0315 01 EN ...

Page 2: ...s for correct connection of the ventilation unit Before connect ing the unit please read and follow all the instructions below The manufacturer reserves the right to make changes including the technical documentation without previous notification Please save the manual for further use Instructions in this manual should be considered integral part of the product For current and full version of the ...

Page 3: ...he unit and report the fault to the supplier immediately After unpacking please check the condition of the heater unit and other accessories In case of doubt con tact your supplier Never install damaged heater unit If you do not unpack the heater unit immediately after its delivery it must be stored in a dry indoor environ ment with the ambient temperature from 5 C to 35 C 2 UNPACK THE UNIT All us...

Page 4: ...PARTS 4 DIMENSIONS Water exchanger Fan Heater body A D B C Air flow direction Exhaust various Types Heater body without cover Type A B C D SAV 2 AC 555 555 350 100 SAV 4 AC 755 755 350 100 SAV 6 AC 855 855 350 100 SAV 2 EC 555 555 335 100 SAV 4 EC 755 755 340 100 Dimensions in the table are in mm ...

Page 5: ...eating innovative solutions for you and your business since 1995 ver 2 09 12 19 4 DIMENSIONS B A Dimensions of the attachment Type A B SAV 2 508 483 SAV 4 708 683 SAV 6 808 783 Dimensions in the table are in mm ...

Page 6: ... water in the exchanger Hot water exchanger made from Cu Al is designed for max operating temperature of water 110 C and max operating pressure 1 6 MPa Dimensions of brackets Dimensions in the table are in mm B A C E D D D D F Type Air Output Voltage Current Input Weight m3 h V Hz A W kg SAV 2 AC 2300 230 50 0 60 130 22 SAV 4 AC 4600 230 50 1 13 270 34 SAV 6 AC 6000 230 50 2 10 480 45 SAV 2 EC 255...

Page 7: ...35 Heater unit may be installed on the wall or ceiling It must be operated in indoor covered and dry premises with the ambient temperature from 5 C to 35 C and relative humidity up to 90 Heater unit is not designed for circulation of air containing flammable or explosive compounds chemical exhalations rough dust soot grease toxins germs etc 15 30 30 15 0 0 500 mm Recommended distance for easy acce...

Page 8: ... is an optional accessory of the heater units and must be ordered separately For any manipulation with the heater unit protective gloves must be used to avoid injury 6 1 2 1 Allocate the wall installation point Mark wholes for fixing the bracket on the wall You can verify correct spacing of wholes by attaching the brack et to the point market A B Type A B SAV 2 504 130 SAV 4 704 200 SAV 6 804 230 ...

Page 9: ...er screws to the heater and leave holders space for holder insertion ca 1 3 of the screw length 3 Put the unit on holders and screw it in 4 Screw lower screws on pad and check tightness of all screws 6 INSTALLATION 6 1 2 2 Install the unit on the wall 1 3 1 3 4 2 It must be fixed firmly to the wall Use quality connecting material for anchor ing ...

Page 10: ...optional acces sories and must be ordered separately For any manipulation with the heater unit protective gloves must be used to avoid injury by sharp edges 6 1 3 1 Allocate the ceiling installation point 6 1 3 2 Install the unit on the ceiling must be fixed firmly to the ceiling Use quality connecting material for anchoring B A Type A B SAV 2 508 483 SAV 4 708 683 SAV 6 808 783 Dimensions in the ...

Page 11: ... the area of water installations who is required to follow standards and regulations in force Water inlet and outlet positions are marked on the heater unit shell Maximum water temperature is 110 C Maximum pressure is 1 6 MPa We suggest installation of stop valves on water inlets and outlets of the exchanger to be able to shut the water supply off Exchangers dispose of bleeder screws located on bo...

Page 12: ...g terminal board for the connection cable in the fan box L L N N 1 230V PE PE PE N L Your partner in ventilation SAVANA SAV L N PE L N PE 1 230V Wiring diagrams for the control system are provided in the manual Die Schaltpläne der Reglung sind in der Anleitung dargestellt Main electrical supply Elektrische Zuleitung KEY TO CODING SAV 4 V KENNZEICHNUNGSSCHLÜSSEL SAV 4 V SAV AC SAV EC Your partner i...

Page 13: ...r supply phases to the heater unit must be connected through a protective power circuit breaker of corresponding current and type Distances between disconnected contacts must be higher than 3 mm The heater unit must be connected so that it is possible to disconnect it from the el power supply by single component Minimum dimensioning of supply cables L L N N 1 230V PE 6 INSTALLATION L L N N 1 230V ...

Page 14: ... unit is switched off Failing that there is a risk of reduced service life of the motor or its damage Should this procedure not be observed a claim regarding possible motor damage will not be admitted For detail description of fan regulation see manuals of individual regulators 6 3 2 2 Water exchanger regulation If the fan is off it is recommended to stop the hot water supply to the exchanger High...

Page 15: ...tly Whether the heater unit is duly covered Whether the regulation is connected correctly 7 1 ACTIVATION Verify basic functions of the device fan operation heating by first activation Verify other possible settings and functions of the product according to the manual to the regulation used 7 2 SETTING THE DIRECTION OF EXHAUST AIR for adjustable laths Make the setting by deflection of laths in the ...

Page 16: ...AV 2 1 SAV 4 FI PYTEL KRUH G2 SAV 4 1 SAV 6 FI PYTEL KRUH G2 SAV 6 1 1 3 2 4 7 3 FILTER INSTALLATION Dust filters may be added to units It is a special filtration medium from synthetic fibres KS 15 60 filtration class G2 These filters are considered accessories and they are not regularly supplied with the unit FILTER INSTALLATION PROCEDURE ...

Page 17: ...t is necessary to wear protective gloves to avoid injury from sharp edges spanner size 10 mm vacuum cleaner hand brush rag non aggressive cleaning agent soap water It is recommended to carry out periodic checks of unit and filter condition after each 500 hours of operation and also before and after the heating season If the heater unit is not in operation for extended time we suggest turning the u...

Page 18: ...ER UNITS It is recommended to carry out periodic checks of the unit after each 500 hours of operation and also before and after the heating season water exchanger contamination check fan condition check in particular fan and bearings function check of water exchanger tightness and connection unit check for possible damage in particular fan basket check of bolt connection tightening in particular f...

Page 19: ...device are not fully open Open fully the stop valves Damaged fan bearings Impeller shows clearance or cannot rotate freely It is necessary to dismantle the fan and replace bearings in an authorised service or replace the complete fan Unbalanced impeller of the fan rotates freely but vibrates shortly when the fan is turned on Dismantle the fan and give it to a professional service for balancing Ins...

Page 20: ...dering a service intervention it is necessary to provide fault specification unit type on the label and place of installation 10 2 PRODUCT DISCHARGE FROM OPERATION DISPOSAL Before you discard the product make it unusable Even old products contain raw materials that can be reused Dispose them in the collection point for processed raw materials It is better to let the product discard in a place spec...

Page 21: ...f the unit it is necessary to read this manual and comply with the above mentioned For any inquiry or request for explanation please do not hesitate to contact our business department or the department of technical support Space for your notes Contact 2VV s r o Fáblovka 568 533 52 Pardubice Czech Republic Website http www 2vv cz ...

Page 22: ...turer is not responsible for damage incurred to the equipment due to unprofessional installation and operation which is contrary to the operating manual and usual conventions for installation and operation of HVAC equipment and regulation systems Stick a label here that you can find in the accessories for future troubleshooting needs ...

Reviews: