6
6. INSTALLATION
6.1 OPERATIONAL CONDITIONS:
The air curtain is designed to be used in an indoor, dry envi-
ronment, with ambient temperatures between
5°C to +40°C
,
a maximum relative humidity of 80%, and to transport air free
of coarse dust, grease, chemical fumes and other contamina-
tion. The electrical protection is IP 20 (against particles larger
than 12.5 mm, not protected against water).
Curtains with electric heater are fitted with an operational
thermostat with automatic reset (located on each heater) and
an emergency thermostat with manual reset.
The water exchangers are designed for a maximum water
temperature of +100°C and maximum pressure of 1.6 MPa.
6.2 INSTALLATION CONDITIONS
The installation and assembly of the unit may be carried out
only by a suitably qualified person who has the adequate
tools!
2 mounting brackets and 4 bolts are supplied with the prod-
uct as standard.
If the unit is to be mounted on threaded rods, they have to be
ordered separately. The following rules should be observed
for the proper function of the unit.
PLEASE NOTE
•
minimum clearances must be observed (see fig. clearanc-
es) with respect to the flammability of materials.
•
the clearances with respect to the flammability of materials
are determined by the architect with regards to the regula-
tions applicable at the place of installation
•
the unit may be installed only in horizontal position
•
there must be at least 200 mm of free space in front of the
suction cover for the proper functioning of the unit
•
the exhaust should be located as near as possible to the
door or the curtain opening
•
the curtain should extend beyond both sides of the open-
ing by at least 100 mm
•
if the curtain is to be installed above a door, place it as near
as possible to the upper border of the door. See that the in-
take and exhaust are not blocked and that the air can flow
freely, see fig.
min. 200 mm
min. 100 mm
min. 50 mm*
min. 200 mm
min. 100 mm
min. 50 mm*
min. 100mm
min. 200mm
If there is a window above the door or another material pre-
venting the installation on the brackets, the unit may be
hanged from the ceiling with threaded rods, directly onto
dowels (see below).
Installation with mounting brackets
YOU WILL NEED
4x dowels (not included)
4x bolts (not included)
Measure the holes on the wall according to the dimension
chart (see “Dimensions”) (observe the installation rules) Do
not forget to choose whether the unit will be installed ac-
cording to A or B and to set the height of the opening accord-
ing to that! Insert back in the opening in the curtain (and
only partially in the curtain) the screws that held the brackets
and hang the curtain from them. Check that the curtain is
fastened properly to prevent it falling
6.3 SUSPENSION:
Summary of Contents for Essensse Neo VCES2-B Series
Page 1: ...ESSENSSE NEO VCES2 B xx VCES2 C xx EN INSTALLATION 4 118 0246 P01 0215 0517 00 ...
Page 12: ...12 10 WIRING DIAGRAM VSES2B100 E1AC ZP xxx VSES2B100 V1 S0AC ZP xxx ...
Page 13: ...13 VSES2B150 E1AC ZP xxx 10 WIRING DIAGRAMS VSES2B150 V1 S0AC ZP xxx ...
Page 14: ...14 VSES2B200 E1AC ZP xxx VSES2B200 V1 S0AC ZP xxx 10 WIRING DIAGRAM ...
Page 15: ...15 VSES2B250 E1AC ZP xxx VSES2B250 V1 S0AC ZP xxx 10 WIRING DIAGRAMS ...
Page 16: ...16 VSES2C100 E1AC ZP xxx VSES2C100 V1 S0AC ZP xxx 10 WIRING DIAGRAM ...
Page 17: ...17 VSES2C150 E1AC ZP xxx VSES2C150 V1 S0AC ZP xxx 10 WIRING DIAGRAMS ...
Page 18: ...18 VSES2C200 E1AC ZP xxx VSES2C200 V1 S0AC ZP xxx 10 WIRING DIAGRAM ...
Page 19: ...19 VSES2C250 E1AC ZP xxx VSES2C250 V1 S0AC ZP xxx 10 WIRING DIAGRAMS ...