
4
2VV.
Creating innovative solutions for you and your business since 1995.
2. UNPACKING
2.1 P
roduct
I
nsPectIon
READ CAREFULLY!
•
Upon delivery, check the product packaging for possible
damage. In the event of damage to the packaging notify
the carrier. If no complaint is filed in a timely manner, sub-
sequent requests will not be considered.
•
Check whether the product is appropriate for your order.
If the product type does not match, do not unpack it and
contact the supplier immediately.
•
After unpacking, check the status of the unit and all of its
components. If in doubt, contact the supplier.
•
Never use a damaged unit.
•
If you fail to unpack the unit immediately after its receipt,
it must be stored in dry rooms at temperatures from +5 ° C
to +35 ° C.
Components Included
READ CAREFULLY!
•
If the ventilation unit was exposed to temperatures lower
than 0 ° C during transport, please unpack unit and let it sit
at room temperature for at least 2 hours before connecting
the unit in order to balance temperature inside unit.
This product must be properly disposed of in accordance
with local laws and regulations. The product contains batte-
ries, so they must be recycled or disposed of separately from
household waste.
When the battery or the product reach the end of their
service life, contact your dealer or local authorities and ask
about recycling options. The separate collection and recyc-
ling of your product and its battery will help to preserve
natural resources and ensure that the product is recycled in
a manner that protects human health and the environment.
Communication cable is not part of delivery and is requi-
red for proper operation of unit.
Recommended cable type: UTP CAT5 class