
Installation Completion
Check the connection of all wires and in the board connector.
WARNING
• Make sure that all the terminals of the unused connectors are properly tightened to avoid
vibrations caused by sound.
• An incorrectly made installation may compromise the device waterproofness. Water infil-
tration may damage the electronic part.
• Make sure that all the holes are filled with some waterproof material – the top part, around
the cables and the screws.
• Use silicone or some other sealant to seal the box against an uneven wall. Thus, you
prevent water leakage and wall damping.
Most Frequent Installation Errors
Always mount the metal bolts and level the bases on an even surface
before
tightening the screws.
WARNING
Make sure that the bases are levelled properly to avoid water leakage and electronic
damage.
Installation
95
Summary of Contents for Access Unit QR
Page 1: ...2N Access Unit QR User Manual...
Page 34: ...1 Module Installation Installation 34...
Page 35: ...Box Installation Installation 35...
Page 36: ...CAUTION When the walling material has hardened break off the side stops Installation 36...
Page 38: ...1 Module Installation into Box Installation 38...
Page 39: ...Installation 39...
Page 40: ...2 Module Installation Installation 40...
Page 41: ...Box Installation Installation 41...
Page 42: ...CAUTION When the walling material has hardened break off the side stops Installation 42...
Page 44: ...2 Module Installation into Box Installation 44...
Page 46: ...3 Module Installation Installation 46...
Page 47: ...Box Installation Installation 47...
Page 48: ...CAUTION When the walling material has hardened break off the side stops Installation 48...
Page 50: ...Installation of Multiple 3 Module Boxes Next to Each Other Installation 50...
Page 51: ...Installation 51...
Page 52: ...Installation 52...
Page 53: ...3 Module Installation into Box Installation 53...
Page 56: ...1 Module Installation Installation 56...
Page 57: ...Box Installation Installation 57...
Page 59: ...1 Module Installation into Box Installation 59...
Page 61: ...2 Module Installation Installation 61...
Page 62: ...Box Installation Installation 62...
Page 64: ...Installation of Multiple 2 Module Boxes Next to Each Other Installation 64...
Page 65: ...Installation 65...
Page 66: ...Installation 66...
Page 67: ...2 Module Installation into Box Installation 67...
Page 69: ...3 Module Installation Installation 69...
Page 70: ...Box Installation Installation 70...
Page 72: ...3 Module Installation into Box Installation 72...
Page 76: ...1 Module Installation Installation 76...
Page 77: ...Installation 77...
Page 79: ...2 Module Installation Installation 79...
Page 80: ...Installation 80...
Page 82: ...Installation of Multiple 2 Modules Next to Each Other Installation 82...
Page 83: ...Installation 83...
Page 85: ...Installation 85...
Page 86: ...Installation 86...
Page 88: ...Installation of Multiple 3 Modules Next to Each Other Installation 88...
Page 89: ...Installation 89...
Page 90: ...Installation 90...
Page 92: ...On uneven wall Installation 92...
Page 94: ...Installation 94...
Page 98: ...Device Connectors Figure 1 Main unit connector wiring Installation 98...
Page 117: ...Troubleshooting Refer to faq 2n cz for the most frequently solved problems Troubleshooting 117...
Page 128: ...2N Access Unit QR User Manual 2N Telekomunikace a s 2024 2N com...