
Part No. 9160347-S
Axis Part No. 02777-001
2N IP Verso Touch keypad & Bluetooth & RFID - 125 kHz, secured 13.56 MHz, NFC
A combined touch keypad – Bluetooth – card reader module helps you
control access using an access code, Mobile Key in your smartphone
or an access card. The module supports the 125 kHz and 13.56 MHz
cards and/or other carriers.
Supported RFID cards 125 kHz:
• EM4x02
• NXP HiTag2
• HID Prox
Supported RFID cards 13.56 MHz:
•
ISO14443A
(MIFARE Classic, MIFARE Plus, MIFARE Mini, MIFARE
Ultralight, MIFARE DESFire CSN only)
•
PicoPass
(HID iClass CSN, Picopass)
•
FeliCa
(Standard, Lite)
•
ST SR
(SR, SRI, SRIX)
•
HID PAC
(HID SEOS, HID iClass SE, iClass SR, HID MIFARE DES-
Fire with SIO, HID MIFARE Classic with SIO)
•
Mobile Key
•
2N PICard
Part No. 9155039
Axis Part No. 02782-001
2N IP Verso – Blind Panel
The blind panel module helps fill up redundant space in installations.
The main unit is supplied with one blind panel module.
Part No. 9155034
Axis Part No. 01257-001
I/O Module
The module provides logical inputs and outputs for integration of sen-
sors or other devices.
The module is installed below another module, i.e., needs no separate
position.
Product Description
17
Summary of Contents for Access Unit QR
Page 1: ...2N Access Unit QR User Manual...
Page 34: ...1 Module Installation Installation 34...
Page 35: ...Box Installation Installation 35...
Page 36: ...CAUTION When the walling material has hardened break off the side stops Installation 36...
Page 38: ...1 Module Installation into Box Installation 38...
Page 39: ...Installation 39...
Page 40: ...2 Module Installation Installation 40...
Page 41: ...Box Installation Installation 41...
Page 42: ...CAUTION When the walling material has hardened break off the side stops Installation 42...
Page 44: ...2 Module Installation into Box Installation 44...
Page 46: ...3 Module Installation Installation 46...
Page 47: ...Box Installation Installation 47...
Page 48: ...CAUTION When the walling material has hardened break off the side stops Installation 48...
Page 50: ...Installation of Multiple 3 Module Boxes Next to Each Other Installation 50...
Page 51: ...Installation 51...
Page 52: ...Installation 52...
Page 53: ...3 Module Installation into Box Installation 53...
Page 56: ...1 Module Installation Installation 56...
Page 57: ...Box Installation Installation 57...
Page 59: ...1 Module Installation into Box Installation 59...
Page 61: ...2 Module Installation Installation 61...
Page 62: ...Box Installation Installation 62...
Page 64: ...Installation of Multiple 2 Module Boxes Next to Each Other Installation 64...
Page 65: ...Installation 65...
Page 66: ...Installation 66...
Page 67: ...2 Module Installation into Box Installation 67...
Page 69: ...3 Module Installation Installation 69...
Page 70: ...Box Installation Installation 70...
Page 72: ...3 Module Installation into Box Installation 72...
Page 76: ...1 Module Installation Installation 76...
Page 77: ...Installation 77...
Page 79: ...2 Module Installation Installation 79...
Page 80: ...Installation 80...
Page 82: ...Installation of Multiple 2 Modules Next to Each Other Installation 82...
Page 83: ...Installation 83...
Page 85: ...Installation 85...
Page 86: ...Installation 86...
Page 88: ...Installation of Multiple 3 Modules Next to Each Other Installation 88...
Page 89: ...Installation 89...
Page 90: ...Installation 90...
Page 92: ...On uneven wall Installation 92...
Page 94: ...Installation 94...
Page 98: ...Device Connectors Figure 1 Main unit connector wiring Installation 98...
Page 117: ...Troubleshooting Refer to faq 2n cz for the most frequently solved problems Troubleshooting 117...
Page 128: ...2N Access Unit QR User Manual 2N Telekomunikace a s 2024 2N com...