background image

Portable N

2

O Source Manual  Rev. B-2 

 

 

 

 

 

 

 

Figure 1.  Diagram of the Portable N

2

O Source and mounting hardware. 

 

 
To install the Portable N

2

O Source follow the following steps: 

 

1)  If there is no regulator mount on the instrument, first install the mount. 

 

Model 211:  If you have a newer instrument that has a regulator mount on the back 
panel, proceed to Step 2.  Otherwise, a new back panel will need to be requested 
from 2B Tech and installed.  Remove the top and bottom cover first and disconnect 
all connections to the back  panel.  Taking a photo of the connections to the back 
panel is a good idea to help ensure that the connections are remade correctly after 
installation  of  a  new  back  panel.    Transfer  all  the  components  on  the  old  back 
panel to the new one.  Mount the regulator mount to the back panel using the two 
#10  pan  head  screws  and  split  locking  washers  supplied  with  the  Portable  N

2

Source.    Install  the  back  panel  on  the  instrument  and  install  the  top  and  bottom 
panels. 
 

N

2

O outlet (1/8” barb) 

 
Pressure regulator 
 
On/off valve (black knob) 
 
Inlet pressure gauge 
 
Two #10-

32x1/2” Phillips head 

screws with split washers 
 
Regulator mount 
 
One #10-

32x1” socket cap screw with 

flat washer 
 
Removable cartridge cup to hold 
disposable N

2

O cartridges. A 

removable insert enables the use of 
either 8-g or 16-gram cartridges. 
 

Summary of Contents for 211

Page 1: ...e N2O Source For use with the Model 211 Scrubberless Ozone Monitor and Model 408 NO Calibration Source Copyright 2017 2B Technologies Inc All rights reserved Technical Support www twobtech com techsup...

Page 2: ...icological effects of N2O other than asphyxiation at extremely highly concentrations due to exclusion of oxygen N2O is not itself combustible but it strongly supports combustion of organic materials a...

Page 3: ...to the back panel is a good idea to help ensure that the connections are remade correctly after installation of a new back panel Transfer all the components on the old back panel to the new one Mount...

Page 4: ...from sliding Install the regulator mount on the left panel using the two 10 pan head screws and split locking washer supplied with the Portable N2O Source Install the left panel on the instrument and...

Page 5: ...9 or email us at techsupport twobtech com Shipping Box Contents Open the shipping box and verify that it contains the following 1 Piercing device with integrated pressure regulator and removable inser...

Page 6: ...ght 2 Close the on off valve by rotating the knob clockwise until you feel the knob stop turning 3 Unscrew the cartridge cup from the assembly Do not completely remove the cartridge cup until you are...

Page 7: ...ob turned completely clockwise 2 To use the Portable N2O Source check that there is tubing connecting the source to the instrument and then open the on off valve by turning the knob completely counter...

Reviews: