Manual
page 8 of 11
Handbuch VC Tilting Davits EN 1_3.docx
FN:
552603b (LG f. ZRS Graz)
Bank:
RB Graz-Mariatrost
1st-Relief GmbH
VAT No.:
ATU76757859
Swift/BIC:
RZSTAT2G223
Schulgasse 5
IBAN:
AT08 3837 7000 0420 9185
8010 Graz, Austria
3.5
Installation Sequence
Basic Steps for Tilting Davit Installation:
1. Measure total length of dinghy and outboard combined.
2. Locate the dinghy side to side centring on platform (be sure the outboard does not
overhang the platform)
3. Locate the aft davit/deck plates by following the dimensions shown.
4. Locate the fore davit/deck plates by following the dimensions shown.
5. Complete the deck plate installation to the platform by drilling a hole (slightly larger than
deck plate base) at the centre of each deck plate location shown below then attach using
#10 through bolts/backing plates or washers.
4
Tips for the operation of the tilting Davit
4.1
Get Familiar with your Davit
,
Adjustable Bunks
(1st23VCTILTRIB2
model only)
Threaded Deck
Plates
Bolts/Split
Washers/Flat
Washers
Upper davit arm
(tilts)
Lower davit arm
(fixed)
Hitch Pin/lock,
ring/lynch pin
Figure 8 Davit Parts
Figure 9 Hitch Pin/lock