Zy QJ Series Скачать руководство пользователя страница 4

                                                                   

 

Fig.2 

 

-

 List 3

 (Installation Dimensions)

 

Model   

D0 

Weight

kg

 

QJ1-50 

Ф

50 

220  160 

Ф

130 

120  M12 

100 

10 

QJ1-80 

Ф

80 

220  160 

Ф

130 

120  M12 

100 

QJ4

13

-50 

Ф

50 

215  185 

Ф

125 

125 

Ф

14 

100 

11 

QJ4-80 

Ф

80 

235  185 

Ф

160 

160 

Ф

18 

100 

13 

QJ3

QJ12

-80 

Ф

80 

235  185 

Ф

160 

160 

Ф

18 

100 

13 

QJ13 

Ф

80 

235  185 

Ф

160 

160 

Ф

18 

100 

13 

 
 
8.Installation & Debugging 

8.1

Relay Installation 

8.1.1. The relay core must be taken out and the bandage used to fix in transit be disassembled berore installation 
of the relay leaving factory.Check all of the fastenings if they become flexible, if the snap ring(float) and guard 
board move flexibly,and if the contacts open and close reliably. 
8.1.2

The relay should be installed in the pipe connector between an oil-immersed transformer’s oil tank and a 

conservator.Internal diameter of the pipe connector should be the same with the relay’s pipe diameter(caliber),and 
the arrow on the relay must be directed to the conservator. It is allowed that the conservator end is higher however 
the degree of inclination may not exceed 4% between the pipe connector’s axis and level surface or the method for 
installation of inclined air fitting pipe may be used so that the gas inside the taansformer can smoothly enter into 
the relay. 
8.1.3

  In order to be converient to overhaul the gas relay at site,its installation site needs to guarantee that the 

relay’s core may be smoothly taken out of the case.The height for QJ4-25 type to be taken out is 130mm, and that 
for QJ4-50 and 80 types 150mm. 
8.1.4 .Open the valve in the connecting pipe, take down the gas lock dust cover, and unscrew gas lock nut 2 by 
hand (not to take down the nut) after installation to exhaust air till the air nozzle’s oil spill, and then screw down 
the nut. 
8.1.5

Take down blocking screw 4 in the cover of the relay before open the oil valve if it is necessary to connect 

with the air dust box, then srew on joint chair 3, and then connect conduct pipe 6 to joint chair 3 with nut 4 and 
cushion 5 (please refer to 

Fig.2 

and

 3)

. The gas block in the relay can be normally used after connected with the 

air duct box. 

 

1

2

3

4

5

6

to 

gas collecting

 box

 

Fig.3

 

Отзывы: