background image

Install Your ZCSM-RP Connected Remote Pressure Monitor

The ZCSM-RP Connected Remote Pressure Monitor should be installed indoors in a dry location.  Outdoor installations, direct 

sunlight, or high humidity may affect the life of the product.  Avoid installing the device where the device or cables may extend into 

walkways or present a tripping hazard.

1. 

The stainless steel pressure transmitter has a ¼” NPT male connection.  Using Teflon tape for all connections, install the brass 

tee onto the pressure transmitter.  

Caution:

 only wrench on the hex connection of the pressure transmitter.  Install the 1/4” test 

cock into the branch of the tee.  Then install the 1/4” brass nipple into the tee.  1/2 x 1/4” and 3/4” x 1/2” bushings are provided 

so the ZCSM-RP Connected Remote Pressure Monitor can be installed into 1/4”, 1/2”, or 3/4” NPT connections.

2.  The Connected Remote Pressure Monitor can be installed on any existing test port in your plumbing system. Flush all dirt and 

debris from the system connection before installation. Wrench on the brass fittings to install. Bleed air from system, if applicable.

3.  The pressure transmitter cable should be plugged into the pressure transmitter.  Align the plug to match the socket and press 

firmly to insert.  Use care when unplugging as the locking tab can be damaged.

4. 

Once the ZCSM-RP is installed, open any system shutoff valve to provide water to the ZCSM-RP.

NOTE: Verify a Zurn Gateway is installed with 1,000 feet of your ZCSM-RP prior to completing the next step.

If a Zurn Gateway is still needed, please refer to proceeding section to request and install your Zurn Gateway to connect your 

product.

5.  Once the water is turned on, plug the 120vac wall adapter into a nearby power outlet. Insert the small plug into the black cable 

on the ZCSM-RP. If not previously completed, register your ZCSM-RP Connected Remote Pressure Monitor. The system will 

take about two minutes to boot up and start transmitting data.

Test Your Network and Register Your Products

It is recommended to test your network when installing a new Gateway.  For the following steps, ensure you have the 

serial number recorded from the ZCSM-RP Connected Remote Pressure Monitor.

Test Your System Network

Make sure your gateway and products communicate now that everything is installed by conducting a system connection test:
1. Plug in the ZCSM-RP Connected Remote Pressure Monitor, ensuring it is within 1,000 feet of the Zurn Gateway.

2. Browse 

plumbsmart.zurn.com/install

 by typing in the ZCSM-RP Connected Remote Pressure Monitor product serial number.

3. Click on the ‘Validate’ button. If the system recognizes the Zurn Connected Product, it will instantly connect to the Zurn Cloud.

Register Your Products

Prior to registering, the building, floor, and room must be setup in plumbSMART™.  You may then register your product in

plumbSMART™ to start receiving data.

Use the plumbSMART™ mobile application for quick registration:

1.  Using the mobile app, scan or enter the serial number to register and locate each connected plumbing product as you install it.

Or register using the plumbSMART™ online porta

l:

1.    Ensure you have the ZCSM-RP Connected Remote Pressure Monitor product serial number.

2.  Go to 

plumbsmart.zurn.com

 Log in to your plumbSMART™ account and select the 'Register Products' option from the  

 

'Products' menu within the main blue navigation bar.

3.  Follow the prompts to complete the registration.

4. 

At this point, you can give your Zurn Connected Product a unique name and assign it to a specific building location.

5. 

Finally, confirm or adjust your alert parameters based on your desired system operation.

More instructional videos can be found on the support page in the plumbSMART™ portal.

3

ZURN WILKINS

1747 Commerce Way, Paso Robles, CA 93446 Phone:

855-663-9876 

 Fax:805-238-5766

www.zurn.com

Содержание ZCSM-RP

Страница 1: ...0 psi LEAD FREE 1 ZURN WILKINS 1747 Commerce Way Paso Robles CA 93446 Phone 855 663 9876 Fax 805 238 5766 www zurn com ZCSM RP REMOTE PRESSURE MONITOR TEE NIPPLE TEST COCK 3 4 x 1 2 BUSHING POWER CABLE WRENCH HEX AREA 1 2 x 1 4 BUSHING NOT CONNECTED PRESSURE SENSOR CORD ON BOX AC POWER ADAPTER SERIAL NUMBER Connected Remote Pressure Monitor Model ZCSM RP Serial Number Date Code Part Number ZURN CO...

Страница 2: ...d into the electrical outlet STEP 3 Confirm the status of the three LED indicators Status LoRa and Cell to complete your setup Status LED double flashes green every two seconds LoRA LED is ON solid green two minutes after being powered Cell LED is ON solid green two minutes after being powered Request and Install Your Zurn Gateway Call Before You Install Your ZCSM RP Connected Remote Pressure Moni...

Страница 3: ...ly completed register your ZCSM RP Connected Remote Pressure Monitor The system will take about two minutes to boot up and start transmitting data Test Your Network and Register Your Products It is recommended to test your network when installing a new Gateway For the following steps ensure you have the serial number recorded from the ZCSM RP Connected Remote Pressure Monitor Test Your System Netw...

Страница 4: ...ed in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or mor...

Страница 5: ...the wall outlet then recon nect or plug into wall outlet Alert should automatically clear within 1 hour aftger repowering the monitor May need to refresh the web page by clicking on reload icon in the browser to clear the alert Step 2 If Zurn monitor has power yet Device Not Communicat ing severe alert still has not cleared after 1 hour or after refreshing the web page then verify Zurn gateway has...

Страница 6: ...r after selecting the correct product model May need to refresh the web page by clicking on reload icon in the browser to clear the alert Flow Meter Signal Detected information alert posted in plumbSMART Step 1 Verify installed product has no connections to middle cable Step 2 Remove any wires connected to middle cable Momentarily power off the Zurn Connected Remote Pres sure Monitor then reapply ...

Отзывы: