Zurn Industries, LLC
|
Specification Drainage Operation
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In Canada
|
Zurn Industries Limited
3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292
www.zurn.com
Rev.
A
Date:
5/15/2018
C.N. No.
140024
Form No. FT902
Page 7 of 7
Dimensional data (inches and [mm]) are subject to manufacturing tolerances and change without notice.
Z880
SETTING THE TRENCH
After attachment of acessories, anchor and level trench in the excavation using concrete patties around the feet. Make finish
pour of concrete and be certain to properly vibrate concrete to eliminate any unwanted voids. Finish troweling should be done
to set the top edge of the trench drain 1/16” [1.6mm] below the floor grade. Remember to compensate for concrete shrinkage
that may occur durning cure so that the edge of the trench drain does not protrude above the finished floor grade.