background image

National unified service hotline

400-106-9616

Name

Shenzhen ZuoWei Technology Co., Ltd.

Web

XXX[VPXFJDPN

Email

JOGP![VPXFJDPN

Add

Yifenghua Innovation Industrial Park, Xinshi 

           Community, Dalang Street, Longhua District, Shenzhen

The persuit of love is endless

NBOVBM!PG!JOUFMMJHFOU!JODPOUJOFODF!

DMFBOJOH!SPCPU

Содержание ZH101

Страница 1: ... Shenzhen ZuoWei Technology Co Ltd Web XXX VPXFJ DPN Email JOGP VPXFJ DPN Add Yifenghua Innovation Industrial Park Xinshi Community Dalang Street Longhua District Shenzhen The persuit of love is endless NBOVBM PG JOUFMMJHFOU JODPOUJOFODF DMFBOJOH SPCPU ...

Страница 2: ... deodorization components 2 4Hose assembly and Host Installation III Usage 3 1Target group 3 2Start up preparation 3 3Machine cleaning 3 4Machine handling 3 5Usage schedule 3 6Precautions before and after use 3 7 Clean and disinfection 3 8Automatic mode 3 9Manual mode 3 10Parameter setting and query IV Safety Warning V Troubleshooting VI Specifications VII Maintenance and repair VIII Product recyc...

Страница 3: ...ressure with a total of three adjustable high medium and low levels Water temperature adjustment button Touch the up or down arrow of the button to adjust the high or low water temperature with a total of three adjustable high medium and low levels Poop button In manual mode press this button to enter the poop handling procedure Pee button In manual mode press this button to enter the pee procedur...

Страница 4: ...ee cleaning process Press the button to enter the drying process Stops the current processing action 1 2 4Display screen Press the button will apply a warm water wash to a person s private parts Press this button to rinse the inner surface of the working head Mode Selection Manual mode Automatic mode Clean air After selecting manual mode poop pee clean wash and dry will enter the selectable state ...

Страница 5: ... end of the bucket cover will be successfully stuck into the slot of the suction port of the machine which means the bucket is loaded into the correct position Push active latch 2 Place the sewage bucket in the sewage bin placement in Hos 3 1 Sewage bucket placement Heating water tank Press and hold the unlock button downward to pull the active pin outward To remove the bucket press the unlock but...

Страница 6: ...orant assembly to the bottom with a little pressure 2 2 3Deodorization component installation Reach your fingers into the groove of the front cover and lift the cover outward 1 Slowly close the front cover by hand Note that the lid suction force is large careful to pinch the hand Grasp the hose sewage tube connector first Host wire from the hose wire hole through then the Host connection part alig...

Страница 7: ...cket 3 5Usage schedule The first week of use is based on the principle of gradual increase so that the user can gradually adapt to the use of the care robot Day 1 4H Daytime Day 2 8H Daytime Day 3 10H Daytime Day 4 12H Daytime Day 5 12H Evening After that it is recommended that each continuous use time should not exceed 12 hours 3 2 Start up preparation 3 2 1Make sure the connection between the wo...

Страница 8: ...r 3 minutes After the care robot is turned on click the button in the main interface of the display to enter the device control interface 3 8 1 Setting of automatic mode 3 8 1 1 Press the Auto Mode button on the device control interface the system switches to auto mode The icons of Poop Pee Wash and Dry on the display screen are gray and the button are not clickable At the same time the Auto butto...

Страница 9: ...ble state The buttons return to the clickable state At the same time the Manual button on the remote control is illuminated 3 9 2 How the manual mode works When the INCONTINENCE CLEANING SYSTEM is in manual mode the Host will start the preset program to collect excrement clean and dry the defecation area according to the manual operation information provided by Remote Control and the display Durin...

Страница 10: ...event backflow of water 4 2 6 Do not use heavy objects to press the hose assembly and do not over bend the hose assembly 4 2 7 the correct voltage to prevent damage to the Make sure to use machine AC220V Warning 试 4 2 10This equipment must be installed and used in power supply systems with grounding conditions 4 2 8 If the power cord is damaged to avoid danger it must be replaced by a professional...

Страница 11: ...and screws Machineconnector not tightened or screws not tightened Replace filter deodorization 3 Clogged filter deodorization Correctly docked hose and work head latch locked Replace the seal The connection between the working head and the hose is not tight Sealing ring at the hose joint is aging Check if there is a seam on the inner thigh Check whether the package pants are loose Work head center...

Страница 12: ...is product reaches the end of its life please send it to a suitable place to protect the environment DUQLQJ 7KLV GHYLFH FRPSOLHV ZLWK SDUW RI WKH UXOHV 2SHUDWLRQ LV VXEMHFW WR WKH IROORZLQJ WZR FRQGLWLRQV WKLV GHYLFH PD QRW FDXVH KDUPIXO LQWHUIHUHQFH DQG WKLV GHYLFH PXVW DFFHSW DQ LQWH UIHUHQFH UHFHLYHG LQFOXGLQJ LQWHUIHUHQFH WKDW PD FDXVH XQGHVLUHG RSHUDWLRQ KDQJHV RU PRGLILFDWLRQV QRW H SUHVVO D...

Отзывы: