
Chapter 4 Product Installation
Figure 4-24 ZXSDR R8882 L268 Are Installed On Pole
– End of Steps –
4.5 Mounting On Gantry
Steps
1.
Assemble the gantry.
a. Install the vertical shaft and the bottom plate by using the M5 x 16 screw, as shown
in
Figure 4-25 Installing The Vertical Shaft And The Bottom Plate
4-21
SJ-20110104194923-001|2011-01-19(R1.0)
ZTE Proprietary and Confidential