background image

ZXMW NR8950 Hardware Installation Guide

1.4 Preparation for Tools and Instruments

Prepare tools and instruments listed in

Table 1-1

, and use them in accordance with the

actual requirements.

Table 1-1 Tools and Instruments

Name

Example

Name

Example

Antistatic wrist

glove

Spanner

Wire stripper

Crimper

Crystal

connector

crimper

Wire

punchdown

tool

Hex wrench

Screwdriver

Plier

Paper knife

Crowbar

Telescope

1-6

SJ-20151105160201-004|2016-01-27 (R1.1)

ZTE Proprietary and Confidential

Содержание ZXMW NR8950

Страница 1: ... Transmission System Hardware Installation Guide Version V2 04 02 ZTE CORPORATION No 55 Hi tech Road South ShenZhen P R China Postcode 518057 Tel 86 755 26771900 Fax 86 755 26770801 URL http support zte com cn E mail 800 zte com cn ...

Страница 2: ...e the user of this document shall not acquire any license to the subject matter herein ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice Users may visit the ZTE technical support website http support zte com cn to inquire for related information The ultimate right to interpret this product resides in ZTE CORPORATION Revision History Revis...

Страница 3: ...sion No Revision Date Revision Reason l Added steps to adjust the XPD value in 2 1 3 2 0 Buckle Installation R1 0 2015 11 25 First Edition Serial Number SJ 20151105160201 004 Publishing Date 2016 01 27 R1 1 ...

Страница 4: ......

Страница 5: ...2 2 4 2 2 Separate Installation Dual Polarization 2 33 Chapter 3 Cable Installation 3 1 3 1 Cable Installation Requirements 3 1 3 2 Installing the Protective Grounding Cable 3 2 3 3 Installing the Power Cable 3 3 3 4 Installing the Ethernet Cable 3 5 3 5 Installing the Optical Fiber 3 7 3 6 Installing the XPIC Cross Connect Cables Optional 3 8 Chapter 4 Installation Check 4 1 4 1 Installation Chec...

Страница 6: ...djusting the Polarization Mode of an Antenna C 1 C 2 Adjusting the Antenna Azimuth C 4 C 3 Adjusting the Antenna Pitch Angle C 5 Appendix D Installing the PIMDC D 1 Appendix E Installing the PSE E 1 Glossary I II SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 7: ...lation Describes how to install the ZXMW NR8950 Chapter 3 Cable Installation Describes how to install the cables of the ZXMW NR8950 Chapter 4 Installation Check Describes the checking process after the ZXMW NR8950 installation is completed Chapter 5 Power On and Power Off Describes how to power on and power off the ZXMW NR8950 Appendix A Antenna Pole Installation Optional Describes antenna pole in...

Страница 8: ... situation Failure to comply can result in serious injury equipment damage or interruption of major services Caution indicates a potentially hazardous situation Failure to comply can result in moderate injury equipment damage or interruption of minor services Note provides additional information about a topic II SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 9: ... Tools and Instruments 1 6 1 1 Completed Installation Powered Through a Power Cable If the ZXMW NR8950 is powered through a power cable it is directly connected to the DC power supply equipment through the DC lightning protection module PIMDC see Figure 1 1 1 1 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 10: ...ightning protection module 4 Operating terminal 5 DC power supply Powered Through PoE In a PoE power supply scenario the ZXMW NR8950 is connected to the PSE module by an Ethernet cable connected to the Ethernet electrical interface GbE1 PoE see Figure 1 2 1 2 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 11: ... power supply 5 Operating terminal Powered by an AC Power Supply In an AC power supply scenario the AC DC power supply equipment is used to convert the AC voltage 90 V AC 290 V AC to the DC voltage 54 V DC see Figure 1 3 1 3 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 12: ...enna 2 NR8950 3 DC lightning protection module 4 AC DC power supply equipment 5 Operating terminal 6 Photoelectric converter used for commissioning 1 2 Installation Flow For the ZXMW NR8950 installation flow see Figure 1 4 1 4 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 13: ...r personal injury due to falling objects l To avoid eye injury caused by laser beams installation personnel must not directly look at the cross section of any optical fiber or the socket of an optical terminal during the installation of optical fibers l Replacing any part or a device might result in unexpected dangers Therefore replacement of any part or a device can be implemented only after auth...

Страница 14: ...e them in accordance with the actual requirements Table 1 1 Tools and Instruments Name Example Name Example Antistatic wrist glove Spanner Wire stripper Crimper Crystal connector crimper Wire punchdown tool Hex wrench Screwdriver Plier Paper knife Crowbar Telescope 1 6 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 15: ... Name Example Pulley PVC insulating tape Hand file Marking pen Waterproof cement Hoisting cable Tape Sleeve Multimeter Grounding resistance tester Compass GPS 1 7 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 16: ...ZXMW NR8950 Hardware Installation Guide This page intentionally left blank 1 8 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 17: ...tion l For detailed information of the installation process refer to 2 1 3 2 0 Buckle Installation Without combiner For detailed information of the installation process refer to 2 2 1 1 0 Separate Installation Single Polarization For detailed information of the installation process refer to 2 2 3 2 0 Separate Installation Dual Polarization Split in stalla tion With combiner For detailed informatio...

Страница 18: ...see Figure 2 2 Figure 2 2 Adjusting the Guide Pin Direction Note During the guide pin adjustment please strictly perform the related operations in compliance with the directions mentioned in Figure 2 2 3 Place the guide pin on the guide hole and tighten the guide screws clockwise see Figure 2 3 2 2 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 19: ...Contents Buckle Installation 2 3 Separate Installation 2 21 2 1 Buckle Installation 2 1 1 1 0 Buckle Installation For the installation components and tools used in 1 0 buckle installation refer to Table 2 2 2 3 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Страница 20: ...ol Qua ntity Graph Antenna One ZXMW NR8950 One Hex wrench One set Lubricant One Prerequisite The ZXMW NR8950 polarization mode is the same as that of the antenna Steps 1 Remove the waveguide diaphragm from the ZXMW NR8950 s antenna interface see Figure 2 4 2 4 SJ 20151105160201 004 2016 01 27 R1 1 ZTE Proprietary and Confidential ...

Отзывы: