background image

Environmental Information

The equipment you purchased has required the extraction and use of natural
resources for its production. It may contain substances that are hazardous to
people’s health and to the environment. To avoid putting such substances into
our environment and to reduce pressure on our natural resources, we ask that
you reuse or recycle your end-of-life equipment by using an accredited elec-
tronics take-back system.
The symbols below indicate that this product should be reused or recycled and
not simply discarded. Please locate and use an appropriate reuse and recycling
site.
If you need more information on collection, reuse and recycling systems, con-
tact your local or regional waste administration. You may also contact your
equipment provider for more information on the environmental performances of
these products.

2

Overview

ZXHN H185 is a simple G.Fast Modem, which is backward compatible with
VDSL2 up to Profile 35b. It provides High Speed Internet through the G.Fast
uplink.

2.1 Features

It supports the following features:

It provides 1 Gbps access bandwidth on short loop (<100 meters) copper
phone lines.

It supports 1 Gigabit Ethernet LAN interfaces which provides higher band-
width and speed for networking and makes the device more future-proof.

It provides services meeting the requirements of various services for the local
devices and network.

It supports TR-069 and it is convenient for operators to facilitate the large-
scale deployment and maintenance by zero-touch provisioning.

2.2 Product Specifications

Technical Specifications

Dimension

145 mm (L) × 52 mm (W) × 127 mm (H)

Certification

CE Certification

Technical Specifications

Содержание ZXHN H185

Страница 1: ......

Страница 2: ...ranties representations or conditions are disclaimed including without limitation any implied warranty of merchantability fitness for a particular purpose title or non infringement ZTE CORPORATION and its licensors shall not be liable for damages resulting from the use of or reliance on the information contained herein ZTE CORPORATION or its licensors may have current or pending intel lectual prop...

Страница 3: ...nge smell Contact the service provider for mainte nance if the device is faulty Environment Requirements Ensure proper ventilation to the device Place the device away from direct sunlight Keep the device ventilated and dry Never spill any liquid on the device Do not place any object on the device to prevent any deformation or damage to the device Do not place the device near any source of heat or ...

Страница 4: ... also contact your equipment provider for more information on the environmental performances of these products 2 Overview ZXHN H185 is a simple G Fast Modem which is backward compatible with VDSL2 up to Profile 35b It provides High Speed Internet through the G Fast uplink 2 1 Features It supports the following features It provides 1 Gbps access bandwidth on short loop 100 meters copper phone lines...

Страница 5: ...on humidity 5 95 non condensing Storage temperature 40 to 70 40 F to 158 F Storage humidity 5 95 non condensing Software Versions Software version V1 0 x x can be 0 9 x represent different customization and do not affect the product firmware and RF output power 2 3 Package Check After unpacking the ZXHN H185 product check that the following items are complete Name Quantity ZXHN H185 1 Power Adapte...

Страница 6: ...re that the system has been equipped with the 10 M 100 M 1000 M Ethernet adapter and supports the TCP IP protocol Because VDSL can be used for broadband access and involves a wide range of multimedia services you are recommended use a computer with such con figurations as above Pentium III 64 M memory 10 G hard disk graphic ac celerating adapter with above 2 M display memory audio adapter and soun...

Страница 7: ...grade is in progress Power Off ZXHN H185 is powered off Solid green DSL synchronization is normal and the link connection is normal Slowly flashing green Physical link exists however carrier wave has not been detected Fast flashing green The DSL connection tries synchronization and training DSL Off Link has not been established Solid green The network is in connection There is no data flow Flashin...

Страница 8: ... Button Function DSL RJ 11 port Used to connect to the G Fast uplink access network LAN RJ 45 ports Used to connect the modem to PCs STBs or other network devices Reset Reset pinhole Used to reset the configuration to factory default settings Power Power supply port It is connected to the power adapter On Off Power On Off Switch 3 2 Hardware Connection Figure 3 3 shows the devices that are connect...

Страница 9: ...hooting All indicators are Off when the ZXHN H185 equipment is powered On First make sure that you have inserted the power adapter of the ZXHN H185 into a working power socket and that the ZXHN H185 has been powered On the switch button is pressed down If the indicators are still Off after confirmation of the above items may be the hardware is damaged You may contact local operator for maintenance...

Страница 10: ...ollowing steps one by one i First check the quality of incoming cables and incoming cable connectors ii Install the ZXHN H185 correctly based on the user guidance Minimize the number of taps iii Check whether the telephone cables and VDSL2 are in good connection or whether the telephone cables are normal iv Try to disconnect the splitter and directly connect the ZXHN H185 to the in coming user cab...

Страница 11: ......

Отзывы: