ZXG10 iBSC Hardware Installation Guide
After drilling the holes, use a cleaner to remove the dust. Measure the hole spacing.
For holes with big spacing error, reposition and drill again.
– End of Steps –
5.3.4 Fixing Cabinet
Steps
1.
Installing the expansion bolts
i.
Use a cleaner to suck dust inside and outside the holes. Measure the spacing
between holes and place the adjustable base to check whether the base matches
the holes. For holes with a large deviation, it is necessary to reposition and re-drill
the holes before installing the expansion bolts, as shown in
Figure 5-23 Installing Expansion Bolt 1
ii.
Take off the washer and the nut of the expansion bolt and place the expansion rod
and expansion bush vertically into the hole, as shown in
Figure 5-24 Installing Expansion Bolt 2
iii. Use a rubber hammer to strike the expansion bolt until the expansion bush is fully
inserted into the ground, as shown in
.
5-18
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Содержание ZXG10 iBSC
Страница 8: ...II ...
Страница 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...
Страница 168: ...Figures This page intentionally left blank ...