ZXG10 iBSC Hardware Installation Guide
Figure 5-9 Cabinet Layout Requirements
2.
Check whether the position of base installation conflicts with that of the frame of
anti-static floor.
Keep the floor frame intact. If the conflict is unavoidable, remove the floor frame where
the conflict occurs during the installation.
– End of Steps –
5.2.4 Positioning Base
Context
Line marking and hole drilling are basic work for equipment hardware installation.
Inaccuracy in these activities will cause great inconvenience to the subsequent work
and affect the installation quality. Therefore, ensuring their quality is the prerequisite for
ensuring the quality of the whole project.
Steps
1.
Marking on the floor
5-8