ZXG10 iBSC Hardware Installation Guide
Figure 7-44 SMA Jumpers
After one end of SMA male jumper connects the RF end of lightning protector / power
divider, route the cable to the front upright cabling slot through the hold on the front
dummy panel and the clearance (25mm height) at the rack top, then route it to the
resource shelf with the ICM board. Finally, route to the ICM board and built-in jumpers
through the horizontal cabling slot in the frame and connect the front panel. Refer to
and
Figure 7-45 Bottom View of Rack-Top (II)
Figure 7-46 Connection of SMA Jumper and ICM Board
– End of Steps –
7-36
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential