C h a p t e r
2
Overview
This chapter describes the installation and commissioning flow of
ZXG10-BS30 (V1.5) which makes the installation personnel to
have a complete understanding of the installation process.
Physical parameters of ZXG10-BS30 (V1.5) such as size, weight,
humidity and temperature also explained in this chapter.
Equipment Installation and
Commissioning Flow
Equipment installation and commissioning flow indicates the
entire process from start (Project survey) to end (final
acceptance) as shown in Figure 1.
Project Survey
Environment survey should be conducted in the site address
according to the information collected from network planning
and provide related data for design and construction.
Engineering Design Drawing
Engineering design drawing should be done by the
professional institutes such as Posts and Telecommunication
Design Institutes according to the project survey results.
Second Environment Acceptance
Before starting the formal construction, implement the
second environmental acceptance according to ZXG10-BS30
(V1.5) Environment Acceptance Report and fill the report on
time. Engineering party should start the construction only
after the site environment as per the requirements.
Unpacking and Inspection
When equipment is delivered to the site, installation team
should determine the time for unpacking according to the
engineering preparation. Unpacking and inspection should be
Содержание ZXG10-BS30
Страница 4: ...This page is intentionally blank ...
Страница 8: ...Appendix C 131 Abbreviation 131 Figures 133 Tables 137 Index 139 ...
Страница 9: ...This page is intentionally blank ...
Страница 10: ......