Chapter 4 Installing the Cabinets
4-3
4000
4000
AC
Ai
r
co
nd
it
io
ne
r
S
tora
ge
ba
tte
ry
pa
ck
31.4961
23.
622
27.
5591
27.
5591
DC
CDMA BTS
T
ra
nsm
is
si
on
equi
pm
en
t
23.622
Feeder hole location
Fig. 4.2-1 Layout of Equipment inside the ZXC10 BTSB I28A Equipment Room
4.3 Installing a Single BTS Cabinet
4.3.1 Installation Flow of a Single Cabinet
The base installation mode is adopted for the BTS cabinet, that is, the cabinet is
installed on the adjustable base provided by ZTE.
When there is no antistatic floor available in the equipment room, the base and the rack
can be mounted directly on the ground. If there is antistatic floor in the equipment
room, angle-steel supports should be prepared by the manufacturers according to the
mounting hole location drawing of the BTS rack and the floor height measured. The
base and rack are then mounted on the support in the same way as fixing the rack onto
the cement ground.
Below is the cabinet installation flow of the ZXC10 BTSB I28A, which should to be
strictly followed.
1. Assemble the cabinet base.
2. Marking/positioning.
Содержание ZXC BTSB I28A
Страница 1: ...ZXC BTSB I28A CDMA2000 Base Transceiver Sation I2 Installation Manual ZTE H K LIMITED ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 22: ......
Страница 38: ......
Страница 54: ......
Страница 68: ......
Страница 104: ......
Страница 112: ......
Страница 140: ......
Страница 158: ......
Страница 172: ......