2
Mounting Kit: Metal
bracket, Backplane,
Metal clamp, M6
expansion bolts & M6
expansion spigots*4, M3
crosshead screws*5
1 POE adapter and AC
Power cord
1 long network cable(for
connecting the device
and POE adapter), 1
short network cable for
connecting the POE
adapter and PC/Router),
RJ45 socket*2
Prepare the following accessories (not included):
•
Crosshead screwdriver
•
Flat head screwdriver
•
Hammer drill
•
Marker pens
Installation Precautions
•
Do not install the device in the following directions:
Do not install the device
with the interface side
facing upwards.
Do not install the device
horizontally.
Do not install the device
tilted.
WARNING!
The device must be installed downwards and vertically. It is not recommended
to install the device in other directions (including but not limited to the above
Содержание MC7010
Страница 1: ...MC7010 Quick Start Guide EN 1 FI 25 SV 52 NO 79 DK 106 ...
Страница 2: ......
Страница 3: ...Scan this QR code to download the Install Helper application ...
Страница 8: ...5 Recommended Installation Locations ...
Страница 27: ...ZTE CORPORATION NO 55 Hi tech Road South ShenZhen P R China Postcode 518057 ...
Страница 28: ...MC7010 Pikaopas ...
Страница 29: ...26 Skannaa tämä QR koodi ladataksesi Install Helper sovelluksen ...
Страница 34: ...31 Suositellut asennussijainnit Seinä Parveke Parveke Tanko Seinä ...
Страница 54: ...ZTE CORPORATION NO 55 Hi tech Road South ShenZhen P R China Postinumero 518057 ...
Страница 55: ...MC7010 Snabbguide ...
Страница 56: ...53 Skanna den här QR koden för att ladda ner appen Install Helper ...
Страница 61: ...58 Rekommenderade installationsplatser ...
Страница 81: ...ZTE CORPORATION NO 55 Hi tech Road South ShenZhen Kina Postnummer 518057 ...
Страница 82: ...MC7010 Hurtigstartveiledning ...
Страница 83: ...80 Skann denne QR koden for å laste ned Install Helper appen ...
Страница 87: ...84 Krav til monteringssted og medium Krav til monteringssted Krav til monteringsmedium Monteringsstang ...
Страница 88: ...85 Anbefalte monteringssteder ...
Страница 108: ...ZTE CORPORATION NO 55 Hi tech Road South Shenzhen Kina Postnummer 518057 ...
Страница 109: ...MC7010 Lynvejledning ...
Страница 110: ...107 Scan denne QR kode for at downloade Install Helper appen ...
Страница 114: ...111 Krav til installationsplads og medium Krav til installationsplads Krav til installationsmedium Monteringsstav ...
Страница 115: ...112 Anbefalede installationsplaceringer ...
Страница 135: ......
Страница 136: ...ZTE CORPORATION NO 55 Hi tech Road South ShenZhen Kina Postnummer 518057 ...