30
6
Pass the four case
screw ⑨ through the
upper and lower plates
of
the
housing
according
to
the
position and direction
shown in the figure;
Screw the four case
nuts ⑩
into the
corresponding screws
respectively according
to the position and
direction shown in the
figure
and
tighten
them.
7
Finish.
11.1.3 Other description
If you need to install and deploy other development board accessories or
peripherals on the housing (such as the eMMC memory card fan for the Obi MID-Light
3D camera, etc.), please refer to the installation instructions for the corresponding
accessories.
11.2 The power adapter
11.3 RTC
11.4 Touch module and LCD display
11.5 Microphone array ( Far field pickup algorithm , Noise reduction algorithm and
act)
Содержание P1
Страница 1: ...1 Zora P1 DEVELOPMENT BOARD Zora P1 V1 0 電波法により5GHz帯は屋内使用に限ります ...
Страница 6: ...6 1 8 Product size description 116 100mm ...
Страница 8: ...8 b Connect the OTG interface of development board through windows win 10 or win7 system computer ...
Страница 13: ...13 e 2 Software interface English f Import firmware x img ...
Страница 14: ...14 f 2 Software interface English g Click the start button enter burning state ...
Страница 15: ...15 g 2 Software interface English h Complete firmware burning ...
Страница 24: ...24 9 Hardware data of development board 9 1 Schematic diagram ...
Страница 25: ...25 9 2 Hardware design drawing a Front of plate and frame drawing b bakc of plate and frame drawing ...