5- 4
5.2 Boom Assembly
5.2.1 Cable
5.2.1.1 Disassembly
Plastic chain
Steel cable chain
Figure 5-3 Cable system disassembly
a.
Adjusting the boom to a fully retracted state.
b.
Disconnect the pipeline from the ground control box.
After the hydraulic line is disconnected, the port of the pipeline should be blocked immediately to
prevent dust and other pollutants from entering the hydraulic system.
a.
Mark and disconnect the hydraulic lines from base boom to the control valve. Collect the hydraulic
oil in the pipeline with a suitable container, and seal the port of the pipeline after collecting.
b.
Mark and disconnect the harness of the travel switch from the side of base boom.
c.
Mark and disconnect the hydraulic lines and harness from the telescopic boom to the upper leveling
cylinder, from the telescopic boom to the jib. Collect the hydraulic oil in the pipeline with a suitable
Moving tube1 Moving tube2
Cable
Fixed tube
1
2
3
4
Moving tube
Cable
Fixed tube
1
2
3
4
Содержание ZT20J
Страница 8: ......
Страница 9: ......
Страница 17: ......
Страница 18: ......
Страница 25: ......
Страница 26: ......
Страница 43: ......
Страница 44: ......
Страница 58: ......
Страница 59: ......
Страница 83: ......
Страница 84: ......
Страница 96: ......
Страница 97: ......
Страница 105: ...7 8 Figure 7 11 Electrical Schematics Figure 1 6 Perkins engine ...
Страница 106: ...7 9 Figure 7 12 Electrical Schematics Figure 1 6 Deutz D447 engine ...
Страница 107: ...7 10 Figure 7 13 Electrical Schematics Figure 1 6 Deutz D2 9 engine ...
Страница 108: ...7 11 Figure 7 14 Electrical Schematics Figure 2 6 ...
Страница 109: ...7 12 Figure 7 14 Electrical Schematics Figure 3 6 ...
Страница 110: ...7 13 Figure 7 16 Electrical Schematics Figure 4 6 ...
Страница 111: ...7 14 Figure 7 17 Electrical Schematics Figure 5 6 ...
Страница 112: ...7 15 Figure 7 18 Electrical Schematics Figure 6 6 ...
Страница 113: ...7 16 7 5 Hydraulic Schematics Figure 7 19 Hydraulic Schematics Figure ...